Financial support for other organizations
Pilot-Credits SSpc83:Offsite Financial Support for Habitat Protectionposted by Dan Ackerstein on
Is there precedent for achieving this credit with financial support for organizations other than NFWF or Amazonas Sustainable Foundation (FAS)? There are many well-respected land trusts makin
Difficult Development Areas and Poverty Rate Qualified
CS-v4 LTc3:High priority siteposted by Hetvi Vora on
Does a site that falls under the DDA areas need to be poverty rate qualified in order for me to achieve the priority designation credit under High Priority Site?
Exterior concrete curing compound
NC-v4 EQc2:Low-emitting materialsposted by akshaya bhaskar on
we are working on a project under LEEED V4 BD&C, does the exterior concrete curing compound (to be used on the exterior slabs) need to meet the VOC threshold to be credit-compliant?
City Potable Water Analysis Reports
NC-v4 WEc3:Cooling tower water useposted by Saif Abdulameer on
Can I use the potable water analysis reports from the city utility to calculate the cycles?
Calculating CO2 setpoint for carbon dioxide monitoring
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Edgar Arevalo on
I've been looking at Appendix C of ASHRAE 62.1-2010 for a way, and I keep scratching my head. Does anyone how to calculate for the CO2 setpoint to pursue the carbon dioxide monitoring strateg
Credit For Excess Chilled Water Rejected To Plant Site Chilled Water System
NC-v4 EAp2:Minimum energy performanceposted by Michael Hill on
I am working on a project that is using heat pump chillers to generate hot and cold water for the building systems.
No Cooling Tower ACP Feedback
Pilot-Credits WEpc94:No Cooling Towerposted by on
I found this pilot credit to be a great way to allow projects to earn credit for the design choice of choosing not to utilize cooling towers on the project even for buildings that are lar
Irrigation Establishment Period Flexibility / Regional Adjustments
NC-v4 WEp1:Outdoor water use reductionposted by Pooja Sannamani on
For the WE pre-requisite and credit Outdoor Water Use Reduction, specifically Option 1 (No Irrigation Required), can the irrigation system installed go beyond the maximum two-year
Gross Floor Area
CI-v4 MPR3:Must comply with project size requirementsposted by Edgar Arevalo on
For a LEED Commercial Interior fit-out project, when we are registering the project in LEED Online it asks for the gross square footage. Since gross floor area also includes the exterior wall
Total Material Cost
posted by Arda Buyuklu on
Why is providing Total Material Cost required/necessary when completing a LEED v4.1 Materials Reporting Form?