Forum quick links
Pilot credit Requirement
Pilot-Credits SSpc55:Bird collision deterrenceposted by on
Commenting to comply with credit requirements. Credit language is clear and the team was able to implement without trouble. The project used a highly reflective glazing to comply.
High Rise Residential
NC-v4 EAc3:Advanced energy meteringposted by Megan White on
We have a 24 story high rise residential apartment project that wants to pursue this credit however we are looking for guidance as this seems more geared towards commercial office projects with mul
Future open space preservation- Campus project
NC-v4 SSc3:Open spaceposted by Andy Rhoades on
My question is regarding a multi-phased campus project. Are we able to count future planned open space towards the credit threshold, and if so, what documentation would this require (i.e.
Lighting Control in blood draw spaces
Healthcare-v4 EQc6:Interior lightingposted by Heather Belsey on
For the lighting credit you need to have individual controls at 90% of patient positions. LEED defines patient positions as:
Commissioning near end of construction
NC-v4 EAp1:Fundamental commissioning and verificationposted by Nadia Azzam on
Partial Floor LEED Certification
CI-v4 MPR3:Must comply with project size requirementsposted by Edgar Arevalo on
I have a project that is a partial floor fit-out where the client would like that partial space to be LEED certified. The project space is approximately 52% - 60% of the total floor
Existing PV on previously certified project
NC-v4 EAc5:Renewable energy productionposted by Yu Zhang on
I have a project that is a new building located on a previous certified LEED project with PV production. The previous project had >90% offset by energy use and >100% offset by cost from
50% surface area reuse
CI-v4.1 MRc2:Interiors Life-Cycle Impact Reductionposted by Mark Ragucci on
how is this credit calculated? can in include existing floor slab and deck? we are leaving a portion of the exiting walls that are about 20ft tall and our ceilings will be at 9'.
Waste performance yields a score of zero points in ARC
EBOM-v4.1 MRp3:Waste Performanceposted by jimmy Adames on
Hi, Our building is a very automated distribution center for an apparel company. Due to the nature of the business, we receive cardboard cases with product and before it ships to customers, a
One-time air testing: how to enter readings in the ARC platform
EBOM-v4.1 EQp4:Indoor Environmental Quality Performanceposted by jimmy Adames on
Greetings, I have a few questions regarding this credit.