Forum quick links
Pursuit of Social Equity Within Project Team
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Patty Marr on
Our team is pursuing Social Equity within the project team as a pilot credit.
Interior Lighting Credit: Surface Reflectance Exemptions for Theatrical or Performance Areas
NC-v4.1 EQc6:Interior Lightingposted by Atlas Turner on
I'm working on a project that needs to document surface reflectance to pursue the second point under Interior lighting.
Social Equity Within The Supply Chain
Pilot-Credits IPpc144:Social Equity within the Supply Chainposted by Atlas Turner on
The updated Social Equity within the Supply Chain appears to be more achievable.
Air Change Requirement
Pilot-Credits INpc155:Design for Indoor Air Quality and Infection Controlposted by Nina Szewczak on
Can anyone comment on the source of the #1.c requirement for five air changes per hour?
Documentation for Project-Specific Recycling of Commingled Waste
NC-v4 MRc5:Construction and demolition waste managementposted by Erica Downs on
All the guidance I can find says to "provide documentation of project-specific rates" or the facility's annual average rate. I cannot find info on what kind of documenation would be required
Vacant Retail Spaces and Materials and Resources Credits
NC-v4.1 MRc4:Material Ingredientsposted by Gabrielle Mote on
I had a clarifying question as we near our final construction submittal for LEED. Our building consists of occupied space for City Hall with 5 retail spaces on the ground floor.
Parking Base Ratios for Rescue Station
NC-v4 LTc7:Reduced parking footprintposted by Anna Pooler on
Hello,
Feedback after pursuing PC132
Pilot-Credits MRpc132:Procurement of Low Carbon Construction Materialsposted by Dirk Kestner on
We are completing our pursuit of this Pilot Credit. Overall it went well. Here are a few comments and observations:
Is pc98 required to earn pc99?
Pilot-Credits IPpc99:Design for Enhanced Resilienceposted by Elizabeth Powers on
Can someone clarify if a project needs to have performed the hazard assessment in pilot credit 98 and during pre-design, in order to be eligible for this pilot credit, or does this pilot credit mea
Social Equity within the Project Team (Option 1)
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Atlas Turner on
Is there a reason why this pilot program for IPpc90 references social equity within the operations and maintenance staff and not social equity within the project team?