Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Lighting control for presentation in meeting room

NC-v4 EQc6:Interior lighting
posted by  Elyse Dufrene  on 

LEED requirement says that Lighting for any presentation or projection wall must be separately controlled.

1
Fri Aug 31, 2018, 4:30 pm

Review Comment: Leakage Rate Calculations

EBOM-2009 EAp3:Fundamental refrigerant management
posted by  Levi Jimenez  on 

More of a solution than a question I suppose;  I was recently provided the following review comment:

-----

0

excel spreadsheet locked problems

NC-v4 EQc2:Low-emitting materials
posted by  alix fox  on 

The Products tab only has enough space for 9 items, and the "add a line" button doesn't work. I copied and pasted the blank lines with formatting in order to add all the items I need.

0

Drinking water test necessary if plumbing removed

Pilot-Credits EQpc105:Lead Risk Reduction
posted by  Zara Fahim  on 

The project site is on a historic district which had significant ground water and soil contamination. The project building is also an existing building that is being renovated for the project.

1
Tue Feb 13, 2024, 4:26 pm

Fan demand from Performance Outputs tab exceeds fan power from Air-Side HVAC tab

NC-v4 EAp2:Minimum energy performance
posted by  Edgar Arevalo  on 

I have received this question generated by the LEED v4 Minimum Energy Performance calculator stating "The fan demand (as reported in the Performance Outputs tab) for the baseline and/or proposed ex

5
Energy/Sustainability Engineer
ads ENGINEERS, DPC
LEEDuser Basic Member
21 thumbs up
Thu Aug 30, 2018, 1:26 am

VOC budget calculation success for partially compliant category?

NC-v4 EQc2:Low-emitting materials
posted by  Joanna Switzer  on 

Hi all, Despite following the instructions tab details, I have been encountering Low-emitting spreadsheet/calculator errors when attempting to generate assembly calculations to overcome several (g

3
Sustainability Project Manager
Atkins
LEEDuser Basic Member
59 thumbs up
Wed Aug 29, 2018, 7:19 pm

Duct-mounted CO2 monitors

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Edgar Arevalo  on 

The design for a current building involves installing CO2 sensors in the return duct of each densely occupied space rather than inside of the space itself.  Since the LEED v4 BD+C handboo

3
Wed Aug 29, 2018, 5:34 pm

HVAC only project

LEED Rating System Selection
posted by  Krysta Aten-Schell  on 

Looking for guidance on HVAC-only scope project.  We are preparing a proposal for an exsiting DoD facility on an Army Base.  The RFP requires minimum LEED Silver Certification (formal cer

3
Wed Aug 29, 2018, 1:35 pm

LEED Indoor water use calculator

NC-v4 WEc2:Indoor water use reduction
posted by  Jason Garvens  on 

If a project is using reclaimed greywayter and rainwater stored in a cistern to flush toilets in a building how would one properly account for that on the LEED Indoor water use reduction calculator

3
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Wed Aug 29, 2018, 1:29 pm

Formaldehyde levels too high in ONE room

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Jenni Betancourt  on 

For a current higher education project, they performed the Air Testing and it shows everything in compliance except for one room showed a level out of compliance for Formaldehyde.

2
Default Avatar
Industrial Hygienist
Aria Environmental, Inc.
LEEDuser Basic Member
1 thumbs up
Wed Aug 29, 2018, 3:18 am