All equipment tested as part of commissioning?

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Jill Watkins  on 

I am LEED consultant on a convention center renovation/addition and some team members are asking whether or not all equipment needs to be tested in all modes of operation, or if one of each ty

3
President
AGR Consulting, LLC
LEEDuser Basic Member
14 thumbs up
Mon Aug 5, 2019, 5:47 pm

Excel spreadsheets

NC-2009 MRc4:Recycled Content
posted by  Brian Harris  on 

How does one "Unprotect" protected cells in the Materials and Resources Calculator and Low-Emitting Materials Calculator excel spreadsheets provided through LEEDonline?

6
Default Avatar
LEEDuser Expert
472 thumbs up
Wed Jul 31, 2019, 6:19 pm

Water splashing into my freezer with no ice maker.

LEED v4.1 Discussion Forum
posted by  GeorgeMendes GeorgeMendes  on 

My ice maker was not making ice. Despite turning it off, water still flowed into my freezer causing a mess.

1
Wed Jul 31, 2019, 2:06 pm

Partial credit with v4 substitution

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Cindy Quinn  on 

We have a v2009 project that is within walking distance of 6 diverse uses as seen through the requirements of the v4 version of this credit.  There is not a residential district nearby. 

1
Wed Jul 31, 2019, 1:59 pm

Government mandated fixtures - exempt?

NC-v4 SSc6:Light pollution reduction
posted by  Jeff Wiedmeyer  on 

On a project located in New Jersey, US, we have some regional government mandated light poles for street lighting leading into our LPB.  If these street lights are mandated by local government

5
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Mon Jul 29, 2019, 1:37 pm

option 2 - Is Land donation acceptable as alternate?

NC-v4 SSc2:Site development - protect or restore habitat
posted by  Navisa Jain  on 

Hi,

Does land donated to a national entity for conservation qualify instead of financial support? 

3
LEED Fellow 2011, Principal
Kath Williams + Associates
LEEDuser Premium Member
104 thumbs up
Mon Jul 29, 2019, 1:31 am

Extended Producer Program meets Waste Management

NC-v4.1 MRc3:Sourcing of Raw Materials
posted by  Mike Bahr  on 

This credit gives the option to use products that are purchased from a manufacturer that participates in an extended producer responsibility program to meet the requirements.

1
Tue Feb 11, 2020, 4:11 pm

Fire Station FTE

Calculating FTEs
posted by  Grace Rink  on 

Hello, the existing threads about calculating FTEs and peak occupants for fire stations do not seem to arrive at the same solution, and I haven't found any specific to v4, so I appreciate any guida

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Wed Jul 24, 2019, 12:22 pm