Any way to exclude non-electrical consumption
NC-v4 EAc7:Green power and carbon offsetsposted by Edgar Arevalo on
The client wants us to pursue this credit with the hopes of achieving two points, for this project we are consuming both electricity and natural gas as per the energy model. However, the clie
Electrical Buses as an Innovation Credit
NC-v4 INc1:Innovationposted by on
A Mass transit project will be using Electric buses to serve the routes. As for LTc8 Green Vehicles, the project already has preferred parking and EV charging stations covered.
Option 2 - Priority Designation
CS-v4 LTc3:High priority siteposted by Peter Doo on
My project site has a mixed-use zoning designation by the County in which it resides.
Systems Narrative Template
EBOM-v4.1 EAp1:Energy Efficiency Best Management Practicesposted by Ben McEwen on
Hi,
I'm wondering if I can use the same BAS System Narrative Template from V2009 for V4.1?
Thanks,
Ben
Defining the baseline for the LCA credit
posted by Nihar Pathak on
Hello,
So my question is about the baseline that needs to be defined for the LCA credit under v4.1.
Declare labels
NC-v4.1 MRc4:Material Ingredientsposted by Susan Di Giulio on
The Reference Guides for both v4 and v4.1 state that:
10% peak demand reduction
NC-v4 EAc4:Demand responseposted by Yu Zhang on
I have a project where DR program is not available, so we are setting up the project to have the infrastructure and developing the plan for demand response.
Showerhead with dual spray settings
NC-v4 WEp2:Indoor water use reductionposted by Edgar Arevalo on
It is very hard to find a showerhead with 1.00 gpm, but finally found one with WaterSense label. The only exception is the head has a dual spray setting, which toggles between 1.00 gpm and 1.
Documentation Submittals
Pilot-Credits IPpc89:Social equity within the communityposted by Elissa Wu on
Hi Community,