Forum quick links
500-year floodplain
ND-Plan-v4 SLLp5:Floodplain avoidanceposted by Marc Mondor on
The v4 reference manual states "locate on a site that is entirely outside any flood hazard area shown on a legally adopted flood hazard map...". For projects without a flood map, it says to l
Asphalt Paving Base Material
NC-2009 MRc2:Construction Waste Managementposted by Randy Weatherly on
I understand that I can re-use asphalt and concrete paving on the site for this credit, but does this also apply to the 6" type "A" crushed stone aggregate base below these paving types.
AHU Prefilters MERV Requirement
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Teaaron Frye on
On a project that we are finishing up the AHU has two sets of filters - MERV 8 prefilter then a MERV 13 main filter. Are the prefilters required to be MERV 13 as well?
Surrounding density
Retail-CI-v4 LTc2:Surrounding density and diverse usesposted by Anna Kaelin on
Hello,
I am working commercial - retail project which is under LEED v4 version. Location is Houston, Tx.
Sharing Whole-Building Energy and Water Usage Data
CI-2009 PIf1:Minimum Program Requirementsposted by Kristen Streeter on
A client has asked for clarification of how this would happen so they can determine which box to check in the form.
Option 2 Optimization - from what?
NC-v4.1 MRc2:Environmental Product Declarationsposted by Margaret Montgomery on
I think, perhaps foolishly, that we may have some products that can meet this requirement, but can only move forward if I can answer two key questions:
The project is the central energy plant
NC-v4.1 WEc3:Optimize Process Water Useposted by Stephanie Graham on
Our project is a LEED v4/v4.1BD+C new central cooling plant which uses geothermal for cooling on a university campus. Besides the plant, the building has office areas for the operators o
Solar Panels
CI-v4 EAc1:Enhanced commissioningposted by Alexis Voeltner on
Do solar panels that are being installed by the building owner need to be commissioned before the LEED submittal or can the commissioning be done later?
Multi Attribute Optimization
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Vibha Pai on
Is there any USGBC approved program which would help projects achieve credit points pursuing the option 2 multi attribute optimization of MR BPDO-EPD? Thanks in advance!
Mass Floor vs. Slab below grade for CSv4 - Prescriptive Approach
CS-v4 EAc2:Optimize energy performanceposted by Kena David on
We are pursuing CSv4 for a project and using the prescriptive approach for Optimize Energy Performance.