Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

500-year floodplain

ND-Plan-v4 SLLp5:Floodplain avoidance
posted by  Marc Mondor  on 

The v4 reference manual states "locate on a site that is entirely outside any flood hazard area shown on a legally adopted flood hazard map...".  For projects without a flood map, it says to l

1
Thu Jul 23, 2020, 6:11 pm

Asphalt Paving Base Material

NC-2009 MRc2:Construction Waste Management
posted by  Randy Weatherly  on 

I understand that I can re-use asphalt and concrete paving on the site for this credit, but does this also apply to the 6" type "A" crushed stone aggregate base below these paving types.

2
Default Avatar
LEEDuser Expert
472 thumbs up
Thu Jul 23, 2020, 4:08 pm

AHU Prefilters MERV Requirement

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Teaaron Frye  on 

On a project that we are finishing up the AHU has two sets of filters - MERV 8 prefilter then a MERV 13 main filter. Are the prefilters required to be MERV 13 as well?

1
Wed Jul 22, 2020, 11:25 am

Surrounding density

Retail-CI-v4 LTc2:Surrounding density and diverse uses
posted by  Anna Kaelin  on 

Hello,

I am working commercial - retail project which is under LEED v4 version. Location is Houston, Tx.

0

Sharing Whole-Building Energy and Water Usage Data

CI-2009 PIf1:Minimum Program Requirements
posted by  Kristen Streeter  on 

A client has asked for clarification of how this would happen so they can determine which box to check in the form.

2
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Tue Jul 21, 2020, 9:36 pm

Option 2 Optimization - from what?

NC-v4.1 MRc2:Environmental Product Declarations
posted by  Margaret Montgomery  on 

I think, perhaps foolishly, that we may have some products that can meet this requirement, but can only move forward if I can answer two key questions: 

6
Director of Global Market Sustainability
Interface
LEEDuser Premium Member
30 thumbs up
Mon Jul 20, 2020, 8:59 pm

The project is the central energy plant

NC-v4.1 WEc3:Optimize Process Water Use
posted by  Stephanie Graham  on 

Our project is a LEED v4/v4.1BD+C new central cooling plant which uses geothermal for cooling on a university campus.  Besides the plant, the building has office areas for the operators o

0

Solar Panels

CI-v4 EAc1:Enhanced commissioning
posted by  Alexis Voeltner  on 

Do solar panels that are being installed by the building owner need to be commissioned before the LEED submittal or can the commissioning be done later?

4
Sustainability Project Manager
UL Solutions
LEEDuser Expert
11 thumbs up
Thu Jul 16, 2020, 3:37 am

Multi Attribute Optimization

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Vibha Pai  on 

Is there any USGBC approved program which would help projects achieve credit points pursuing the option 2 multi attribute optimization of MR BPDO-EPD? Thanks in advance!

2
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Tue Jul 14, 2020, 11:57 pm

Mass Floor vs. Slab below grade for CSv4 - Prescriptive Approach

CS-v4 EAc2:Optimize energy performance
posted by  Kena David   on 

We are pursuing CSv4 for a project and using the prescriptive approach for Optimize Energy Performance.

1
Tue Jul 14, 2020, 6:52 pm