V4.1 Acoustic Performance Calculator Password

NC-v4.1 EQc9:Acoustic Performance
posted by  John Page  on 

I filled out these Excel Workbook forms several months ago and now I cannot get access because it asks for a Password that I do not have. How can this be bypassed or a Password provided?

0

a great addition for user comfort

Pilot-Credits EQpc47:Acoustic comfort
posted by  Abbie Ford  on 

LEED for Homes seems to take a step back from user comfort compared to some of their other rating systems, and I believe this is a successful way to encourage architects to design for their user.

0

LEED O&M v4.1

LEED v4.1 Discussion Forum
posted by  Summer Gorder  on 

I am working on multiple LEED BD&C version 4 projects, but starting my first O&M project.

0

EQc6 - Interior Lights (ROS & LRV conflicts)

NC-v4 EQc6:Interior lighting
posted by  Olawale Taiwo  on 

There is quite an issue of concern on LRV weighted average calculations on our project per the EQc6 credit, as the project team requires an urgent response to this, please see details bel

1
Thu Sep 10, 2020, 4:17 pm

Is documentation of NO contract required?

Pilot-Credits SSpc129:Comprehensive Composting
posted by  Annalise Dum  on 

Hi all,

Is documentation that no contract is required from the hauler required as proof for this credit?

1
Wed Mar 24, 2021, 8:14 pm

Rainwater cleaned in a swales and drained into a nearby lake to preserve it

NC-v4 SSc4:Rainwater management
posted by  Pooja Sannamani  on 

Our project consists of a building in a waste water treatment plan (WWTP) facility.

1
Thu Sep 10, 2020, 4:45 pm

Preferred Spaces still required?

Schools-NC-v4.1 LTc8:Electric Vehicles
posted by  Brian Salazar  on 

In the new v4.1 language for Electric Vehicles, there is no mention of a preferred location as a requirement for placement of charging stations, nor infrastructure under Option 2.

1
Thu Sep 10, 2020, 12:31 pm

Estimating Energy Use for a Laboratory

CI-v4 EAc6:Green power and carbon offsets
posted by  Parker Hall  on 

My project pursued optimized energy performance option 2 - prescriptive compliance. An Energy model was not created for this building, so I intend to calculate out energy use via the U.S.

1
Fri Sep 4, 2020, 4:08 pm

MRp2/c5 -- Can we count shipping dunnage returned to precast manufacturer as material reuse?

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Terry Thornsbury  on 

We have a large (800,000sf) project that is being constructed primarily using precast floor decks and architectural wall panels.

0

Monitoring based Cx independent of Advanced Energy Metering?

NC-v4 EAc1:Enhanced commissioning
posted by  Joyce Kelly  on 

Our project is pursuing MBCx but the budget cannot support achievement of all rqmts of Advanced Energy Metering. Can we achieve one without the other?

 

1
Tue Aug 25, 2020, 6:00 pm