Project relocated to a new site
NC-v4 IPc1:Integrative processposted by Sara Goenner Curlee on
I have a project that just completed the IP credit requirements before the end of SD, and now finds itself likely needing to relocate to a different site. The proposed new site is about 1
USGBC approved equivalent to EPA registered pesticides
Homes-v4 SSc3:Nontoxic pest controlposted by Sam Badach on
I am preparing the O&M manual as part of credit Non-toxic Pest Control for LEED V4 for Homes.
Enhanced Refrigerant Management - TRANE Calculator Issues
NC-v4 EAc6:Enhanced refrigerant managementposted by Daniel Davis on
Project: 3-story student housing in Danville, KY
EA Green Power and Carbon Offsets Credit: What if project net zero; solar panels?
Schools-NC-v4 EAc7:Green power and carbon offsetsposted by LJ Bryant on
Hello! I am working on a school project that is net zero (all energy offset by solar panels on site).
Option 1 Path 2 - What's Been Your Experience?
NC-v4 EQc4:Indoor air quality assessmentposted by Cynthia Kaplan on
Hi all,
Show of hands for those that have used Option 1, Path 2, post occupancy flush out:
Do you provide trending data for both phases, or just the preliminary phase?
Simulation Model upload
NC-v4 EAp2:Minimum energy performanceposted by R.L. Bowen on
Hi! We recently uploaded a project for review. Unfortunately we missed uploading the actual energy model.
Legal Sources and Responsible Sources
Pilot-Credits MRpc102:Legal Woodposted by on
I'm trying to pursue this Pilot Credit and see that it has to be wood from legal source (100%) and Responsible Sources (70%).
Labs ramping up for v4.1?
NC-v4.1 EQc4:Indoor Air Quality Assessmentposted by Erica Downs on
I'm hearing from a potential EHS contractor that the testing labs are having a hard time ramping up to meet the testing requirements of v4.1, and the testing is going to be quite expensive. I
Reporting of proposed fan brake horsepower.
NC-v4 EAp2:Minimum energy performanceposted by Michael Callan on
I have a question. As I understand it, if the operating fan/pump BHP is available I should be reporting it on the Air-Side HVAC tab, in lieu of the nominal (overestimated) HP as it makes
Are VOC Budgets standard practice?
NC-v4 EQc2:Low emitting materialsposted by Rick Farrell on
As a commercial "wood only" flooring contractor we often do site finished