Forum quick links
UL Certified EPDs.
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Susan Di Giulio on
Hi,
Dimmed Fixtures & Demande Response
NC-v4 EAc4:Demand responseposted by on
We are designing an Assisted Lighting project, where many of the common areas will be dimmed by about 40%. What happens when we receive a DR signal? Since we're already dimmed, wil
Mixed Use apartment complex
Mid-Rise-v4 LTc4:Community resourcesposted by katie nguyen on
I am working on an apartment building that will have retail, offices, and restaurants on the bottom floor. Can I count these uses?
Can we still get points with City's proposed Bicycle Network?
NC-v4.1 LTc6:Bicycle Facilitiesposted by Arega Mehrabian on
We are currently designing Aquatic center near Pioneer High School. there are proposed/Adopted Bike Network passing our site. is that goint to be acceptable?
Pilot-Credits EApc95 - Alternative Energy Performance Metric - LEED Transit New York City
Pilot-Credits EApc95:Alternative Energy Performance Metricposted by Pamela Mendez on
Our Project team was able to use this pilot credit to achieve (1) additional point for our Transit Hall Project located in NYC.
Experience with Pilot Credit 87: Verified C&D Recycling Rates
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Kristen Magnuson on
This pilot credit is very straightforward.
Requirement to treat run-off from pollution generating hard surfaces with LID
NC-v4.1 SSc4:Rainwater Managementposted by Kavita on
Can anyone please confirm if the LEEDv4.1 version of this credit requires to treat run-off from pollution generating hard surfaces with LID?
Fans as an End Use
NC-v4 EAc3:Advanced energy meteringposted by Pooja Sannamani on
Hi, we'd like to make sure we are meeting the intent of the credit correctly when it comes to fans.
Cubicle Hardware Included in Low-Emitting Materials Credit
NC-v4.1 EQc2:Low-Emitting Materialsposted by Nicole Jenkins on
While the language reference cubicle/curtain/partition walls, has anyone included cubicle hardware in the Low Emitting Walls/ Ceiling credit?
PBT Source Reduction Calculator sill required for all LED lighting?
Healthcare-v4 MRp3:PBT source reduction - mercuryposted by Rebecca Mann on
Our healthcare project is a new build, and will specify all LED light fixtures. No fixtures contain mercury.