Baseline System 8

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings, Just a small clarification about the heating plant of System 8. It is written that heating is Electric resistance.

5
Tue Mar 22, 2016, 4:56 pm

Compressor replacement + R422D refrigerant

EBOM-2009 EAc5:Enhanced Refrigerant Management
posted by  Norbert Szircsak  on 

Dear All, I have two issues where I don't really know what would be the proper solution. 1. After about 10 years one of the compressors in a chiller went wrong and has been replaced.

2
Senior Sustainability Manager
WSP - Built Ecology
LEEDuser Expert
188 thumbs up
Mon Jan 25, 2016, 10:43 am

IEQp1 VRP Calculator

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Vassil Vassilev  on 

Greetings, Regarding IEQp1 and VRP Compliance Calculator there is a question on how to enter an AHU having the following characteristics: The AHU is a constant volume device; supplying to several

2
Principal, Energy and Engineering Leader
DLR Group | Westlake Reed Leskosky
LEEDuser Expert
267 thumbs up
Wed Jan 6, 2016, 6:12 am

Invoice Requirements

CS-2009 MRc6:Certified Wood
posted by  Charles Nepps  on 

Per the the FAQ's above: "GBCI had required invoices for all wood products, but has switched to requiring only invoices for FSC certified products, per the April 2008 FSC memo, which states that al

3
NH Green Consulting
LEEDuser Premium Member
80 thumbs up
Wed Dec 30, 2015, 9:37 pm

No local zoning requirements

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Agnieszka Rylska  on 

Is there an Alternative Complance Path for projects outside the US with no minimum local zoning requirements?

3
Tue Dec 8, 2015, 6:24 pm

What is to be considered LID + measures outside LEED Site

NC-v4 SSc4:Rainwater management
posted by  Petr Vogel  on 

Dear all, we have a project site situated in the rural mountains where infiltration is not even possible due to geological conditions.

5
Specialist Consultant
EkoWATT CZ
LEEDuser Basic Member
4 thumbs up
Mon Nov 30, 2015, 7:55 pm

Scope of the credit

Credit Forums
posted by  Frantisek Macholda  on 

Hello, I am not sure if this credit covers the equipment purchased for building management purposes only (i.e.

4
Wed Oct 28, 2015, 7:38 pm

Baseline modeling for manufacturing facility

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Hi Markus and colleagues, There are few issues which I'd like to share, with a request for some advice related to the Baseline project modeling. The project in question is a manufacturing facility

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Oct 27, 2015, 6:04 am

distance between shower rooms and changing rooms

CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Anastasia Makarenko  on 

We currently have a project LEED-CI. It's an office in which there are 4 shower rooms for 730 FTE. There are 4 floors so we have one shower room per one floor.

2
Senior Sustainability Manager
YR&G
LEEDuser Basic Member
27 thumbs up
Fri Sep 18, 2015, 6:43 am

Interior Lighting power

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Hi Markus and colleagues, If in the Proposed building the total interior lighting power (space by space method) is bigger than those of the Baseline, is this acceptable.

5
Tue Sep 15, 2015, 1:50 pm