Forum quick links
outdoor air quality mesurements
CS-2009 IDc1:Innovation in Designposted by Agnieszka Rylska on
One of our clients is planning to install an outdoor air quality station on his building.
Which Option 2 strategies for a warehouse hall?
Warehouses-NC-v4 EQc6:Interior lightingposted by Frantisek Macholda on
Hello,
smoke vents
Warehouses-NC-v4 EQc2:Low emitting materialsposted by Agnieszka Rylska on
The ceiling of the warehouse is supplied with smoke vents. The smoke vents play role in fire protection, provide daylight and water protection.
air transfer
NC-v4 EQp1:Minimum indoor air quality performanceposted by Agnieszka Rylska on
On our project we have a few spaces like corridors and break rooms with kitchen area which don't have a direct ducted air supply from the AHU (CAV system).
Factory-finished docklevellers
NC-v4 EQc2:Low emitting materialsposted by Agnieszka Rylska on
Hello,
Service Hot Water - modeling the circulation pumps for this system
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings,
Regarding modeling the Service Hot Water (SHW) for a project assigned to System 5, our approach was:
Distance between bicycle racks and functional/main entry
Warehouses-NC-v4 LTc6:Bicycle facilitiesposted by Agnieszka Rylska on
This credit requires provision of bicycle racks within 30m of any main/functional entry.
Cooling an electric room
NC-v4 EAp2:Minimum energy performanceposted by Przemysław Rejczak on
Dear Everyone
Baseline - System 5, no cooling
NC-2009 EAp2:Minimum Energy Performanceposted by Zsolt Bako-Biro on
I have a 11000 sqm warehouse (3 units) 24/7 in operation with natural ventilation, no cooling designed or required, heated to 15°C. The OA requirement is met by the level of infiltration of 0.
Requirements for paints and coatings applied on other elements than walls, floors and ceilings
NC-v4 EQc2:Low emitting materialsposted by Agnieszka Rylska on
Hello,