Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

FSC Wood type and certification

CS-2009 MRc6:Certified Wood
posted by  Lilian Seow  on 

I got a declaration letter from the manufacturer of the glulam. The letter states the wood was purchased from a sawmill and it's is FSC Mixed Credit. 1.

1
Tue Jan 21, 2014, 5:43 pm

Design stage submittal credits

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Sylvain laporte  on 

I m currently studying for LEED AP BD+C exam . I failed to find and updated list of credit eligible for design stage submittal. I guess there is something obvious that i missed.

1
Wed Jan 22, 2014, 4:24 pm

Other feature that meets the intend of the credit?

Pilot-Credits EQpc78:Design for active occupants
posted by  Marina Mihalcea  on 

Hi! What if we have an element that meets the intend of the credit but is not included in the list of 11 features from which to choose?

1
Wed Jan 22, 2014, 6:23 pm

Option 1 - Combination of approaches allowed?

CI-2009 MRc5:Regional Materials
posted by  R Jones  on 

Is it possible to use a combination of the 500 mile radius and the alternative compliance path addressing the mode of transport when documenting this credit ?

1
Wed Jan 22, 2014, 4:05 pm

waste management by bedroom vs sf

Homes-v4 MRc3:Construction waste management
posted by  Elizabeth Eason  on 

LEED v4 for homes Table 1:Baseline Waste list waste by both bedrooms and conditioned space but there is no guidance as to when one should use conditioned sf vs bedrooms.

1
Tue May 9, 2017, 5:32 pm

Treated (rain) water for human contact...

NC-2009 WEc2:Innovative Wastewater Technologies
posted by  Jorge Lopez de Obeso  on 

Here is a situation: Rain water is captured and treated for reusing to flush and flow fixtures. A single cistern storages both rainwater and municipal water supply.

1
Tue Feb 4, 2014, 8:39 pm

72 Hour Universal Notification conflicts with weather patterns?

EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Management
posted by  Heather DeGrella  on 

I'm working with a Community College that has numerous campuses in the Portland, Oregon area to submit IEQc3.6 as an ID credit for LEED NC.

1
Thu Jan 23, 2014, 2:47 pm

Pilot Credit 34 Update

Pilot-Credits PC34:Design for Adaptability
posted by  Sandy Chung  on 

Be sure to use the Updated version 8/1/2011. The required features are in line with the California Building Code Accessibility requirements.

0

US Standard VS European standard used (EAp2)

General forums
posted by  Ian McCall  on 

Dear Tristan, Here is another question with regards to LEED certification struggles in Europe, more specifically with regards to EA prerequisite 2 mandatory provisions (sections 5.4, 6.4, 7.4, 8.4,

0

Subtracting built-in furniture/casework from square footage

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  American University  on 

We've had a designer tell us that built-in furniture and case work (like a fan-coil unit enclosure) can be deducted from the square footage of a room when calculating the window opening requirement

1
Thu Jan 23, 2014, 9:28 pm