Forum quick links
a question about DES option 1
CS-2009 EAc3:Enhanced Commissioningposted by Shenhao Li on
Hello! I have a question about EAc3 for DES system.
Credit compliance in elevator halls
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Paula Hernandez on
Hi, Do elevators halls need to be vefified for thermal comfort?, My understanding is that they are "not regularly occupied" spaces, so they don´t, please I will appreciatte any discussion on this a
CxA contract
CS-2009 EAc3:Enhanced Commissioningposted by Agnieszka Rylska on
Can Commissioning Authority be contracted through the design firm (architects) as part of the LEED certification contract (CxA would be an employee of the LEED consultant company) and not by the ow
Data Centers Modeling Guidelines
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Paula Hernandez on
Hello, Is there such a thing?, a Guideline to model Data Centers?, where can I found it? Thank you
One model or various separate models
NC-v4 EAp2:Minimum energy performanceposted by Ana Paula Quiros on
Hello! We are working on a hotel, that rather than a single block consists of several blocks connected by walkways and they share the same parking lot. How should we consider the energy model?
Fire Exits, with no exterior handles
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Jeff Chapman on
Are these an 'primary or secondary entry'?
PAINTS LOCATION
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by gabriel Morales on
Hello: Our project is a Core&Shell office building registered under LEED C&S v2.0 rating system, pursuing credit IEQc4.2 Low-Emitting Materials: Paints and Coatings, there’s something we a
Success with LCA option?
NC-v4 MRc1:Building life-cycle impact reductionposted by Helene Lefkowitz on
Does anyone know of companies that will perform an LCA for this credit? Also, I'm looking to get in touch with a project team that has successfully met the LCA option for this credit.
dedicated exhaust
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Agnieszka Rylska on
I would like to make sure what does "dedicated/designated exhaust" mean.
Individual Control for Transients- Healthcare Project
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by MURAT DOĞRU on
We have a 650-bed hospital building project registered under LEED v3-Healthcare. Whole building is mechanically ventilated and conditioned.