intumescent paints

CI-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Eszter Gulacsy  on 

Has anyone had any experience about VOC limits for intumescent paints for EQc4.2 (i.e. paints for fire-proofing steel)?

3
Default Avatar
Senior ESD Consultant
LEEDuser Basic Member
62 thumbs up
Thu Dec 15, 2016, 1:58 pm

Baseline outdoor airflow with EN 15251 and DCV

CS-v4 EAp2:Minimum energy performance
posted by  Sandra Holmström  on 

Hi, We have a LEED v4 project (office building) were the project team want to use the CEN option for IEQp1 (using EN 15251 instead of ASHRAE 62.1). Also, for the energy modeling, the Proposed bui

2
Thu Dec 15, 2016, 7:07 am

Scrap as regional material

NC-2009 MRc5:Regional Materials
posted by  FABIO VIERO  on 

Hi everyone. Could a scrap of a production process be claimed as regional material, assuming that it is generated and harvested in the same plant (which is, of course less the 160 km from project s

2
President
Energy & Environmental Solutions
LEEDuser Basic Member
0 thumbs up
Thu Dec 15, 2016, 3:58 am

EAp1 Minimum Energy Performance Calculator

NC-2009 EAp2:Minimum Energy Performance
posted by  sriram tetali  on 

Hi, Please help us in solving the Errors in the Minimum Energy Performance Calculator. Project Registered under => LEED NC BD+C -v3 (2009) • Macros are not getting enabled • Shading & Fenes

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Dec 15, 2016, 2:00 am

Performance Period for Recertification

EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitat
posted by  Frances Yang  on 

For EBOM recertification purposes, my project is achieving SSc5 for the first time, through the off-site option. What I know: - For a first certification, we would get a contract to maintain an off

2
Wed Dec 14, 2016, 5:40 pm

Wood Derived Fuel - Used in Home Fireplace

NC-2009 MRc2:Construction Waste Management
posted by  Mario S.  on 

We are working on a project that generates a lot of scrap wood from formwork.

3
Default Avatar
LEEDuser Basic Member
26 thumbs up
Wed Dec 14, 2016, 12:37 am

CxA Same for all Paths?

NC-v4 EAc1:Enhanced commissioning
posted by  Brian Salazar  on 

Does the CxA need to be the same firm/person for Path 2 and Option 2, as it does for Path 1?

4
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Tue Dec 13, 2016, 6:42 pm

Permanently Installed Furniture?

CI-v4 MRc3:Building product disclosure and optimization - environmental product declarations
posted by  Michael Smithing  on 

Option 1 requires that products be permanently installed. Do furniture products installed in a LEED CI project qualify for inclusion in the EPD list?

2
Default Avatar
Project Coordinator, LEED AP, GHG IQ
Teknion Ltd.
LEEDuser Basic Member
3 thumbs up
Tue Dec 13, 2016, 5:49 pm

Value of Enhanced Commissioning

NC-v4 EAc1:Enhanced commissioning
posted by  Hannah Fleck  on 

I have a client who is asking what the value of pursuing enhanced commissioning versus fundamental.

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Tue Dec 13, 2016, 1:57 pm

LEED compliant Drywall

LEED for Homes (LEED-H) Forum
posted by  Phil Vanderloo  on 

I'm trying to search out some LEED compliant drywall for the material and resources credit, (homes v4). Needs to be either 25% post consumer recycled product or 50% pre consumer recycled product.

2
founder/principal
Design AVEnues LLC
LEEDuser Expert
8 thumbs up
Fri Dec 9, 2016, 2:53 pm