LEED V4 -Healthcare Or NC

LEED Rating System Selection
posted by  DON JUNIOR  on 

I am part of a team, trying to decide on which rating system to use for a new construction project. Our project is a hospital outside US (located in Middle East).

1
Fri May 5, 2017, 4:28 pm

Conditions for site fence

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Julian Bork  on 

Hello everybody I have a question about the construction fence as a part of the ESC plan: is there a minimum height for closing or covering the fence with tarpaulins to avoid wind erosion? Many th

1
Sat Aug 26, 2017, 2:12 pm

Projects constructed by diferent owners, same property managment

LEED Guidance for Campuses and Multiple Buildings
posted by  Pedro Urazan  on 

Hi, A land owner wants to develop 2 buildings in a section of his terrain and wants to sell the rest of the parcels.

1
Fri May 5, 2017, 10:07 pm

Increasing certification level after accepting certification?

General forums
posted by  Tommy Linstroth  on 

Is it possible to improve your certification level after accepting final certification?

1
Thu Apr 27, 2017, 8:58 pm

"Categorized as an Office Space"

CS-2009 EAc1:Optimize Energy Performance
posted by  Aaron Frantz  on 

We are proposing a new mixed use multi-story to be submitted under NC, v2009. The first floor will be cold dark shell space for future retail/restaurant tenants.

1
Mon May 1, 2017, 1:49 pm

IAQ calculator v03

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Izabela Kwiecinska  on 

The new calculator (v2009v4_Minimum IAQ Performance Calculator_v03) from the Resources tab, does not count the ‘Zone Outdoor Airflow’ (column N) and it shows 0,00 no matter what system and values w

1
Mon Jul 10, 2017, 10:46 am

Documentation

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Saif Abdulameer  on 

Hello everyone, I am working on the documentation of a Multi zone project for the cooling conditions in this case should the "Zone Primary Air flow Vpz" be equal to the "Zone Discharge Airflow Vd

1
Fri Apr 28, 2017, 2:49 pm

Commissioning of PV system by different commissioning agent

NC-2009 EAc2:On-Site Renewable Energy
posted by  Deborah Lucking  on 

We have had this question come up a few times - the owner and the PV system supplier believe that it can be commissioned by a different commissioning agent.

1
Mon May 1, 2017, 1:06 pm

RE: Would we exclude interior walls that were never permitted?

NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elements
posted by  Diane Hale CHMM, CDGP, CEM, CESCO  on 

We have an existing older building that had interior walls and sectioned rooms put in that were never permitted and were not code compliant.

1
Mon May 1, 2017, 4:00 pm

New O & M Starter Kit IN Credits

NC-2009 IDc1:Innovation in Design
posted by  Kristen Callori  on 

Hello- Now that these new O & M Starter Kit IN credits are available, and they require that (2) O&M Prerequisite Plans be implemented (such as Green Cleaning + Integrated Pest Management) i

1
Fri Dec 1, 2017, 12:24 am