Private shuttle buses

NC-2009 SSc4.1:Alternative transportation - public transportation access
posted by  Hanh Truong  on 

Dear all, I would like to use LI ID# 100001163 : "Shuttle buses should provide direct access to transit facilities within 2 miles of the project site, approximately a 5-10 minute drive, and must b

1
Thu Aug 10, 2017, 12:08 pm

CI clarification

CI-2009 MPR1:Must comply with environmental laws
posted by  Hariraman R  on 

If i want to Certify a portion of a building ?? shall i go for LEED CI ??

0

air-side economizer, how to input in calculator

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Courtney Royal  on 

Our project is a one floor (on the 30th) LEED-CI project gut renovation project.

1
Thu Aug 10, 2017, 10:42 am

List of meters

NC-v4 EAc3:Advanced energy metering
posted by  Vasileios Kalfountzos  on 

Hello all, our project is a Data Center that every single part of it will be metered. Each rack will have two meters while also every electrical panel will have each own meter.

1
Thu Aug 10, 2017, 4:04 pm

Double- Counting of Renewable Energy

CI-v4 EAc4:Renewable energy production
posted by  Bharath Ravuru  on 

Hi, We are going with solar panels on site at our facility. Can I use the renewable energy generated for both on-site renewable energy production credit and also energy savings in the simulation?

1
Mon Aug 28, 2017, 2:09 pm

Phased Flush Out

Schools-NC-v4 EQc4:Indoor air quality assessment
posted by  Cynthia Kaplan  on 

We have a phased reno/add school project that would prefer to earn IEQ 4 by way of post occupancy flush out.

1
Mon Aug 28, 2017, 2:09 pm

Final Cleaning

NC-2009 IEQc3.1:Construction IAQ management plan - during construction
posted by  Benjamin McGrath  on 

For the final cleaning bid package, in our specifications, there is no language requiring that the chemicals used have to be low VOC.

1
Sat Aug 26, 2017, 8:50 pm
1
Sun Aug 27, 2017, 12:07 am

LED integrated in facade window frame/ MLO lighting zone

NC-v4 SSc6:Light pollution reduction
posted by  Ilse Dijkstra-Nugteren  on 

We are working on the LEED V4 certification of a project which will be located at the border of a business park and about 3 kilometers away from highways and an international airport.

1
Fri Aug 11, 2017, 12:33 pm

Vulnerable Populations

NC-v4 SSc1: Site assessment
posted by  Saxon Gibbs  on 

How does LEED define vulnerable populations and what is the best way to assess proximity to them?

1
Mon Aug 28, 2017, 6:45 pm