CS-2009 EAc6:Green Power

Purchasing RECs for Projects with District Cooling

Hi, we have a LEED 2009 registered Core and Shell project in the Philippines which utilizes district cooling. We are to pursue EAc6: Green Power by purchasing RECs, and calculate annual electricity consumption based on compliance path 1 – Design Energy Cost. In the case where energy comes from district cooling and electricity, do we also include in the calculation of 35% of building electricity the district cooling Mbtu/yr consumption (by converting Mbtu to kWh)? Or do we only extract 35% of building electricity from the annual kWh consumption excluding Mbtu consumption from the district cooling? We checked the LEED guidance for projects with district cooling – Treatment of District or Campus Thermal Energy in LEED v2 and LEED 2009 – Design & Construction, 13 August 2010. However, it only provides guidance for projects pursuing EAc6 using the first and second approach for implementation where green power is being utilized in the building.

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Fri, 07/28/2017 - 16:03

You would exclude the district cooling.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.