Forum quick links
Modeling Process Hot water
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi, I am working on a test and reliability manufacturing facility, where we are using close to 65,000 gals of water for process load, what should be a good assumption to figure out how much of that
Pilot Credit LTpc134 - Advanced Transportation Monitoring Systems Pilot credits
CS-v4 INc1:Innovationposted by Adriana Hansen on
For the Advanced Transportation Monitoring Systems pilot credit, do we need to count only people tracked through access control (turnstiles), or also visitors who just stay in the lobby or
Office space only going for partial renovation.
CI-v4 MPR2:Must use reasonable LEED boundariesposted by shashank gangil on
Upload on LEED Online
Pilot-Credits WEpc115:Whole Project Water Use Reductionposted by Catarina Costa Goncalves on
My understanding is that all documentation for WEpc115 must be uploaded in WE section and and not Innovation. Should the documentation be uploaded in Cooling Tower Water Use?
Integrative Analysis of Building Materials- Work Smarter, Not Harder
Pilot-Credits MRpc103:Integrative Analysis of Building Materialsposted by Marina Rullo on
This pilot credit is a useful way to both qualitatively and quantitatively examine the human health implications, environmental impacts, and safety impacts of building materials.
Equity & Community Benefits
NC-v4.1 LTc3:High Priority Site and Equitable Developmentposted by Xavier Mora on
Hello,
to obtain the point of this credit, how does it need to be this equity plan? For who do I need to design?
Should we implement to the neighborhood this plan?
LEED documentation tools?
posted by Lily Li on
Dear LEED users! Have you come across any tools that make LEED design documentation easier?
What Low-Emitting Material category is Tammscrete?
NC-v4.1 EQc2:Low-Emitting Materialsposted by Danielle Waters on
Euclid Tammscrete is a "single-component, polymer-modified, cement based material used for achieving a smooth finish on precast, cast-in-place, tilt-up or other unfinished concrete surfaces with im
Full EPD or only the first few pages?
NC-v4.1 MRc2:Environmental Product Declarationsposted by Kai Starn on
Curious about others experience submitting EPDs for review - do you include only the first few pages which includes the program operator, type, expiration, etc., or have you been asked to provide t