I have a small office fit-out project that is pursuing Option 2 (prescriptive) for Optimize Energy Performance. The base building air handling units, central cooling and boilers, perimeter baseboard heating were not modified. All of the energy savings are being achieved through a reduced LPD, controls, and zoning. Do we still need to provide the ‘AEDG calculator’ as part of our documentation?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Marcus Sheffer
LEED Fellow7group / Energy Opportunities
LEEDuser Expert
5867 thumbs up
June 19, 2020 - 9:38 am
If the credit form asks for it then yes you need to fill out the calculator.