Glazing location for visual access

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  SSN Energy Model  on 

One of our project (office building), sill height of the glazing is 6.5 feet from finished floor level & glazing height is 3.3 feet. All the regularly occupied spaces are having glazings at th

5
Wed Sep 3, 2014, 6:42 pm

LEED Project Boundary

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Rezkar Abdulmajeed  on 

Can someone help me with this please?. I am working now in a health care LEED Project. The LEED Boundary was set already when we submitted the MPR.

2
Default Avatar
Shanghai Pacific Energy Center
LEEDuser Basic Member
12 thumbs up
Wed Sep 3, 2014, 5:34 pm

MRc4 - Recycle Content of Reinforcement Steel

NC-2009 MRc4:Recycled Content
posted by  Keerthi Ratnayake  on 

How can we use the reinforcement steel towards this credit? Generally, suppliers do not have any information. Can we count 50% straightaway? Thanks

2
Default Avatar
LEEDuser Expert
472 thumbs up
Wed Sep 3, 2014, 2:15 pm

Stormwater rate and quantity calculation for case 1

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  sona prajapati  on 

Dear all, We have found a sample calculation to determine storm water rate and quantity for 1 yr-24 hr design storm and 2 yr-24 hr design storm from www.illinoisfloods.org/.../4D_Stormwater%20Volum

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Wed Sep 3, 2014, 5:11 am

90% of average annual runoff

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Jamison Hill  on 

Is that the pre-development runoff rate or post-development runoff rate?

8
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Tue Sep 2, 2014, 3:09 pm

LEED NC 2009 for factory buildings

NC-2009 EAp2:Minimum Energy Performance
posted by  Rathnashree Bharadwaj  on 

The project is a manufacturing facility with ancillary buildings such as admin, health centre, canteen, utility and security blocks. The buildings are not physically connected to each other.

5
Tue Sep 2, 2014, 2:25 pm
3
Sun Aug 31, 2014, 6:05 pm

GREENGUARD Gold (formerly Children & Schools), CA 01350, CARB II

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Linda Davisson  on 

Since LEED-S projects can use NAUF compliance in place of CA 01350, can a NC or CI project use CA 01350 compliance or GREENGUARD Gold (formerly children & Schools) or CARB II in place of NAUF?

8
Default Avatar
Sr. Marketing Analyst
Columbia Forest Products
LEEDuser Basic Member
1 thumbs up
Fri Aug 29, 2014, 3:25 pm

Energy Modeling for Casino

NC-2009 EAp2:Minimum Energy Performance
posted by  Chris Hammett  on 

Hello. I am working on the energy model for a casino/hotel/nightclub. I have been contracted only to develop the model, no input in regards to design.

3
Default Avatar
Mechanical Designer
Turpin & Rattan Engineering, Inc.
LEEDuser Basic Member
0 thumbs up
Thu Aug 28, 2014, 11:46 pm

Post occupancy installation of photovoltaics as an appeal

NC-2009 EAc2:On-Site Renewable Energy
posted by  Kris Phillips  on 

We have a project that may be 1 point short of the next level certification after its Construction Final Review and we have been asked to look at options to add a credit or two as an "appeal" to re

10
Senior Project Manager
Zinner Consultants
LEEDuser Basic Member
110 thumbs up
Thu Aug 28, 2014, 11:36 pm