Commuter Rail = Amtrak?
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Rebekah Burke on
Looking for some experience or assistance with the definition of 'commuter rail'. Would an Amtrak station qualify as a commuter rail station?
Material Cost - Contractor's cost or manufacturer's cost?
NC-2009 MRc4:Recycled Contentposted by Keith Steurer on
When establishing the material cost for MR credits, is the cost of materials defined by what the general contractor pays to buy a product or what the manufacturer pays to manufacture a product?
Permanently Dimmed LED Lamps
CI-2009 EAp2:Minimum Energy Performanceposted by Luis Miguel Diazgranados on
Greetings Everyone, We are working in a CI project, in which, by error, the lightning contractor obtained some LED bulbs with a larger wattage than the lightning designer specified wattage.
MRc5, Furniture and Medical Furnishings
posted by Elizabeth Powers on
I have a couple of questions under this credit and would greatly appreciate any feedback LEED User members might have. Question #1: The credit states that "all freestanding furniture and medical f
Spreadsheet for Data Centers
NC-2009 EAc1:Optimize Energy Performanceposted by Ricardo Marques on
Hi, I can´t find the spreadsheet “A Data Center Power Train 1-150170-11A”. I want the latest version the spreadsheet available.
Non-Predominant Spaces
NC-2009 EAp2:Minimum Energy Performanceposted by Wes Lawson on
We are modeling a building that is separated into three different spaces. These spaces have differing functions, schedules and systems.
Construction Costs
NC-2009 MRc4:Recycled Contentposted by Benjie Herrera on
If we will be using the 45% default for the Construction Cost, How do I determine the Construction Cost? Is it the Constact Amount Value Less the Electrical,Mechanical,Eqpt,Specialty Eqpt. costs?
ANSI/BOMA Z65.1/2010
posted by Malwina Mokrzycka on
Hi, My question is connected with using ANSI/BOMA Z65.1/2010 on PI form 3. Can I use the norm for 'Space Usage Type' and 'Default Occupancy'? Thanks!
Occupancy sensors and 62.1
NC-2009 IEQp1:Minimum IAQ Performanceposted by HOUCINE TLEMSANI on
Hi every one We are working on a gymnasium and using demand control ventilation based on CO2 sensors, Occupancy sensors and monitoring switch at the front desk for some spaces. In spaces where the
CO2 sensors applicable to non regularly occupied space?
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Helena Larsson on
I have a question in regards to non-regularly occupied lunch/breakrooms.