CO2 sensor in area designated for F&B (C&S project)
CS-2009 IEQc1:Outdoor Air Delivery Monitoringposted by William Wong on
Our core and shell commecial development involves designation of one floor of the builidng for F&B and design density is higher than 25 people per 1,000 sq ft.
Office Building Outside US
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Omer Moltay on
Which path is to be followed for an office building outside the US? Is this considered to be eligible for an Energy Star rating?
Supplemental Calculator
Schools-2009 IEQc8.1:Daylight and Views—Daylightposted by Lauren Fakhoury on
This supplemental calculator Excel file only seems to create problems every time I used it!
Which rating system to choose?
posted by Francesco Allaix on
Nice that you have opened this forum Tristan. I have a few questions concerning LEED HC. We have a project where 100% of the space is healthcare facility.
Project Boundary, Site Boundary and Building
CI-2009 SSc1:Site Selectionposted by Arlee Fisher on
We are working on a remodel project encompassing three distinct areas within one portion of a hospital and I am not confident with my understanding of the definitions of Project Boundary vs.
Hospital Fixture Groups
NC-2009 WEc3:Water Use Reductionposted by Susan Walter on
I'm debating how to set up my fixture groups for a large healthcare project. Initially, it makes sense to split into two groups: inpatient and outpatient/other.
Lavatory Faucet default duration change during construcion.
NC-2009 WEc3:Water Use Reductionposted by BH . on
Hi, Due to "Water use reduction Additional Guidance" from July 14,2011 Nonresidential Default Lvatory Faucet duration has changed from 15 to 30 sec.
new project with old HVAC
NC-2009 EAp3:Fundamental Refrigerant Managementposted by Timo Marquez on
I would like to know if the following complies with EAp3: We have a new construction (in process 2011) and the owner is purchasing an old HVAC systems that used R-12.
Fenced playgrounds
Schools-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Daniel McDonald on
We are working on an urban school renovation (SSc2=yes), and I am wondering if having the playgrounds and other outdoor areas behind fences affects this credit at all - are they still "pedestrian o
LEED project defined boundary 1.5 buildings
CI-2009 EAc3:Measurement and Verificationposted by Steve Khouw on
Just to be sure, to be sure, not trying to be picky here. Our new LEED-CI project encompasses 2 buildings, but only 1 is going to be fully occupied and the other only partially,