Using well water for WEc2

NC-2009 WEc2:Innovative Wastewater Technologies
posted by  Karen Stewart  on 

Our MEP has recommended drilling a well and using local well water to flush the tolleits instead of using municipally supplied potable water.

3
President, LEED AP
EcoPotential
LEEDuser Basic Member
38 thumbs up
Tue Aug 5, 2014, 9:06 pm

Attached roofs to the new constucted building

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  esra ozkonuksever  on 

hi everyone, i m working on project where there is a security check point seperate from the original building and a single floor entrance attached to the 3 floor building.

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Tue Aug 5, 2014, 7:54 pm

Daylight for CS v2.0

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Citlali Mora Bello  on 

Hello, we are working on a project that will be submitted under the C&S v2.0 Do you know if we must still meet the 25 fc criteria, before the 2012 addenda? And we also have reception areas wh

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Aug 4, 2014, 11:32 pm

Sample Submittals

Pilot-Credits EQpc78:Design for active occupants
posted by  Claudia Galvis  on 

We found this credit as a very appropriate way to keep our project's future occupants active (our project is a fire station) in addition to the Owner project requirements to promote exercise in the

2
LEED Fellow 2011, Principal
Kath Williams + Associates
LEEDuser Premium Member
104 thumbs up
Mon Aug 4, 2014, 5:48 pm

Groos Square Footage

NC-2009 PIf2:Project Summary Details
posted by  Jessica Garcia  on 

I have a project with a parking lot in the basement and 1 level of construction, for the Pl Form 2 I need to indicate new construction square footage, total gross square footage, and footprint of b

6
Sustainability Manager
University of Washington - Capital Projects Office
LEEDuser Basic Member
2 thumbs up
Sun Aug 3, 2014, 1:35 pm

Airflow measurement devices in manufacturing facility

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  LEED Pro Consultant  on 

Hello, We are working on a project which is an industrial plant, the building will be mechanically ventilated.

3
Sat Aug 2, 2014, 5:58 pm

Peak occupants and FTEs

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Jean-Baptiste Noel  on 

Hi all, For our project, we have 3 shifts of 8 hours each. For the first shift, there are 600 occupants, and for the 2 other shifts, there are 300 occupants.

6
Fri Aug 1, 2014, 10:16 pm

Net metering with one meter or two

NC-2009 EAc2:On-Site Renewable Energy
posted by  Brian Leet  on 

Marcus, Our project is a campus which is pursuing a PPA.

3
Default Avatar
Freeman French Freeman
LEEDuser Basic Member
0 thumbs up
Fri Aug 1, 2014, 7:31 pm

Required Water Heater efficiencies and Standby Losses

NC-2009 EAp2:Minimum Energy Performance
posted by  Matt Scott  on 

I'm having trouble interpreting Table 7.8 in 90.1-2007. The way the performance requirements are listed is confusing, especially for gas water heaters, but I'll get to that in a bit.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Aug 1, 2014, 7:27 pm

Beach Cleanup of Trash - credit?

EBOM-2009 MRp2:Solid Waste Management Policy
posted by  Nate Gillette  on 

All - our client goes out to the beach monthly and does a cleanup. It's mostly trash, including some not so nice items that you don't want to touch without gloves.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Aug 1, 2014, 5:19 pm