Using well water for WEc2
NC-2009 WEc2:Innovative Wastewater Technologiesposted by Karen Stewart on
Our MEP has recommended drilling a well and using local well water to flush the tolleits instead of using municipally supplied potable water.
Attached roofs to the new constucted building
NC-2009 SSc7.2:Heat Island Effect—Roofposted by esra ozkonuksever on
hi everyone, i m working on project where there is a security check point seperate from the original building and a single floor entrance attached to the 3 floor building.
Daylight for CS v2.0
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Citlali Mora Bello on
Hello, we are working on a project that will be submitted under the C&S v2.0 Do you know if we must still meet the 25 fc criteria, before the 2012 addenda? And we also have reception areas wh
Sample Submittals
Pilot-Credits EQpc78:Design for active occupantsposted by Claudia Galvis on
We found this credit as a very appropriate way to keep our project's future occupants active (our project is a fire station) in addition to the Owner project requirements to promote exercise in the
Groos Square Footage
NC-2009 PIf2:Project Summary Detailsposted by Jessica Garcia on
I have a project with a parking lot in the basement and 1 level of construction, for the Pl Form 2 I need to indicate new construction square footage, total gross square footage, and footprint of b
Airflow measurement devices in manufacturing facility
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by LEED Pro Consultant on
Hello, We are working on a project which is an industrial plant, the building will be mechanically ventilated.
Peak occupants and FTEs
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Jean-Baptiste Noel on
Hi all, For our project, we have 3 shifts of 8 hours each. For the first shift, there are 600 occupants, and for the 2 other shifts, there are 300 occupants.
Net metering with one meter or two
NC-2009 EAc2:On-Site Renewable Energyposted by Brian Leet on
Marcus, Our project is a campus which is pursuing a PPA.
Required Water Heater efficiencies and Standby Losses
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Scott on
I'm having trouble interpreting Table 7.8 in 90.1-2007. The way the performance requirements are listed is confusing, especially for gas water heaters, but I'll get to that in a bit.
Beach Cleanup of Trash - credit?
EBOM-2009 MRp2:Solid Waste Management Policyposted by Nate Gillette on
All - our client goes out to the beach monthly and does a cleanup. It's mostly trash, including some not so nice items that you don't want to touch without gloves.