Topic | Recent |
---|---|
Optimize Process Water Use, Option 2 with ASHRAE 90.1 2010 model?NC-v4.1 WEc3: Optimize Process Water Useposted by Deb Favaretto on Nov 9, 2021, 2:37 pm
We are submitting a LEED v4 BD+C NC project with LEED v4.1 upgrades on a credit-by-credit basis. Minimum and Optimize Energy Performance have remained v4. We are interested in pursuing the v4.1... Last reply: Brittany Garneau, Dec 19, 2023, 8:06 am |
|
Multilevel lighting controlNC-v4.1 EQc6: Interior lightingposted by Michael on Jun 26, 2022, 11:55 pm
I have 10 lighting fixtures in an office space, and the architect is providing 3 on-off switches: - switch 1, on-off 5 lightings (50% of lighting numbers) - switch 2, on-off 2... Last reply: Karen Joslin, Dec 18, 2023, 12:51 pm |
|
3rd Party Verified Manufacturer Inventory & Product Lens?NC-v4.1 MRc4: Material Ingredientsposted by Katrina Kashinejad on Dec 8, 2023, 12:37 pm
Hello, I'm looking for confirmation on what counts as 3rd Party Verification for these two types of Material Ingredient Reports:
Last reply: Lauren Richardson, Dec 18, 2023, 11:43 am |
|
Ownership of Attributes: On-Site PV with Utility ProgramNC-v4.1 EAc5: Renewable energyposted by Summer Minchew on Dec 15, 2023, 9:26 am
The LEEDonline form for this credit requires us to, "Upload On-site Renewable Energy Systems...Contract and evidence of renewable attribute ownership.
Last reply: Marcus Sheffer, Dec 18, 2023, 10:00 am |
|
Understanding Pilot-Credits IPpc101Pilot-Credits IPpc101: Integrative processposted by Fatimah Razak on Dec 16, 2023, 8:55 pm
Dear forum members, I'm looking to gain a better understanding of Pilot-Credits IPpc101 and thought I'd reach out to this knowledgeable community. From what I've gathered, Pilot-Credits... |
|
Emissions for a District System in the Minimum Perfomance CalculatorRetail-CI-v4.1 EAp2: Minimum Energy Performanceposted by Marc Maso on Dec 16, 2023, 6:43 am
Hello, I have a building with a district system for cooling, heating and... |
|
LEED Coversheet reporting for SteelNC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materialsposted by Allison Para on Nov 14, 2023, 12:22 pm
Hello Pros, Last reply: Allison Para, Dec 15, 2023, 4:26 pm |
|
Open office space controlNC-v4.1 EQc6: Interior lightingposted by Soha ElYamany on Dec 15, 2023, 6:44 am
I was wondering if anyone was able to comply with the multi-level control requirements in an open office space, realistically speaking, I am not sure how an office space with over 100 people for... |
|
Inherently Non-emitting materialsNC-v4 EQc2: Low-emitting materialsposted by Scott Adams on Mar 12, 2015, 9:04 pm
Would cement mortars and grouts containing 0 VOCs be considered Inherently Non-emitting? Last reply: Konstantina Manou, Dec 15, 2023, 8:20 am |
|
Exemption for workshop spaces?NC-v4 EQc1: Enhanced indoor air quality strategiesposted by Adrienne Franz on May 23, 2023, 4:42 pm
We are doing a building where half the building is offices and the other half is workshops for parks maintenence staff. (I'm talking mechanical, carpentry, tree crew). These rooms have 2 Hollow... Last reply: Dave Hubka, Dec 14, 2023, 12:23 pm |