Enhanced Commissioning and Measurement and Verification
NC-2009 EAc3:Enhanced Commissioningposted by Saju Varghese on
Hello, It been a little hard to draw the line between the enhanced commissioning scope and the measurement and verification scope.
Monitoring-based Cx frequency of analysis and approach clarification
NC-v4 EAc1:Enhanced commissioningposted by Kevin Day on
LEED reference manual states "MBCx can be accomplished via systems submetering, operational points trending, and real-time analyses, such as fault detection and sequence verification."
Drawing Review
NC-v4 EAp1:Fundamental commissioning and verificationposted by Steve Connelly on
Is a drawing review of the building envelope required by EAp1 Fundamental Cx if Enhanced Option 2 is not being pursued?
Onsite Apiary
Pilot-Credits SSpc82:Local food productionposted by Stephen Ward on
Does having an apiary on our campus count towards the amount of area reserved onsite for food production?
Calculating landscaping
NC-v4 SSc2:Site development - protect or restore habitatposted by Tracy Jordre on
My question is related to both the Protect or Restore Habitat and Open Space credits. In the past I have included the total area of any landscaping bed, not just the area of each plant themse
Artificial Turf - Considered Hardscape?
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Marina Wrensch on
I am working on the LEED documentation for SSc7.1 for a softball stadium. The infield is clay and the outfield is artificial turf.
E-waste
CI-v4 MRp1:Storage and collection of recyclablesposted by Agnieszka Rylska on
Is it enought that the tenant only will provide a safe storage for e-waste or is it required that the building also provides a central storage for all tenants?
Software for Energy Modelling
NC-v4 EAc2:Optimize energy performanceposted by Andrea Valentini on
Hello.
I'm working on a project in Italy and evaluating to buy a new BIM software.
Is there anyone who knows if it's possible to analyze our building with a proper BIM SW?
Shared walls with another structure in baseline and proposed
NC-v4 EAc2:Optimize energy performanceposted by Christine McKinley on
Hello,
In my baseline model, can I show shared walls as exposed to exterior and then in my proposed model treat that wall as a partition?
AIA Resolution for Urgent and Sustained Climate Action
posted by Michael Davis on
Greetings, green gurus: