Introduction
posted by Summer Minchew on
I am new to the SAL and honored to be included. I'm Summer, managing partner at Ecoimpact Consulting.
Envelope commissioning
NC-v4 EAc1:Enhanced commissioningposted by Ricardo Sá on
Dear All,
In the context of a large new Office Building (22 000 m2) which field-tests are required as a minimum under the scope of Building’s Envelope Commissioning?
DES Proposed Case Default Efficiencies
NC-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Dear All,
Shop Applied vs. Site Applied Wood Coatings
NC-v4.1 EQc2:Low-Emitting Materialsposted by Waleed AlGhamdi on
We have a project with a lot of wood trim/wall panels on the interior.
Energy Performance Periode
EBOM-2009 EAc1:Optimize Energy Performanceposted by Leandro Silva on
Dear all,
Good afternoon.
COVID-19 Outside Air vs. Filtration
posted by Luke Leung on
Team,
See this paper regarding outside air vs. filtration.
https://www.sciencedirect.com/science/article/pii/S0360132313002515
Supply and Return Fan Tracking OA compliance
NC-v4 EQp1:Minimum indoor air quality performanceposted by Mike oliva on
I feel like I've seen this discussed before on here but I'm not finding it at the moment. We're wondering if a VAV system serving multiple spaces can use AFMS at fan inlet bell for supply and
Simple buildings with only restroom fixtures and irrigation
NC-v4 WEc4:Water meteringposted by Susan Di Giulio on
I have this question for several university projects: the only water interior use in the buildings is restrooms.
Coffee vendor in Public Building
NC-v4 WEp2:Indoor water use reductionposted by Summer Gorder on
Our Public Project is hiring a vendor from the Blind Association as part of their equity policy. The ice machine they are providing is air cooled, but is not Energy Star.
Is sedimentation filtration required for LID?
NC-v4.1 SSc4:Rainwater Managementposted by Garrett Ferguson on
Is sedimentation filtration required for LID for this credit?