Topic | Recent |
---|---|
impact of green lease clausesPilot-Credits EApc159: Green Leases ACPposted by Belén Valladares López on Oct 23, 2024, 7:26 am
Dear all We are drafting a green lease for an office building. Does anyone have experience with the implications of introducing “green” clauses in a commercial lease? Best Last reply: Nicole DeNamur, Oct 24, 2024, 1:27 pm |
|
Refrigerant Management Plan TemplateNC-v4.1 EAc6: Enhanced Refrigerant Managementposted by Chris Wapelhorst on Oct 23, 2024, 6:11 pm
For v4.1 one of the required uploads to LEEDOnline is a refrigerant management plan. There are some templates from the older versions of LEED, that don't really apply to the new version... |
|
Exterior Lighting TAB for MEP Calculator for Multiple BuildingsNC-v4 EAp2: Minimum Energy Performanceposted by Richard Tran on Sep 27, 2024, 10:06 am
Hello, I'm currently working on a leed comment back from our LEED Reviewer from this project stating: "3. Based on the information provided in the Lighting tab, the input reports,... Last reply: Tyler Thumma, Oct 24, 2024, 9:39 am |
|
LEED v4.1- Third Party CertificationsNC-v4 EQc2: Low-emitting materialsposted by Pablo Jimeno on Mar 26, 2019, 2:26 pm
Hello All, We are considering adopting LEEDv4.1 requirements for the Low Emitting Materials credit across our projects. We note that... Last reply: Dave Hubka, Oct 24, 2024, 9:18 am |
|
Errors in the ASHRAE AEDG Table excel file?CI-v4 EAc2: Optimize Energy Performanceposted by Mark Terpstra on Sep 30, 2024, 6:06 pm
The workbook available on the USGBC website does not appear to be properly updating when changing the climate zones. Here are some examples for k-12 schools:
Last reply: Tyler Thumma, Oct 24, 2024, 8:18 am |
|
What does the "three times the head height" measure mean?CS-v4 EQc5: Quality Viewsposted by Marine Petrosyan on Sep 5, 2023, 10:54 am
There is a requirement for projects with unobstructed views, for regularly occupied floor area within three times the head height. But I can't figure out, and can't find any explanation about how... Last reply: Nadav Malin, Oct 24, 2024, 8:08 am |
|
Energy modeling of Seconday pump in equest:NC-v4 EAp2: Minimum Energy Performanceposted by PURUSHOTHAMAN on Oct 9, 2024, 2:08 am
In my project, for the base case as per ASHRAE 90.1-2010 Sys-8, I need to model both the primary and secondary pumps in the chilled water loop. However, in eQUEST, the default loop is created... Last reply: Tyler Thumma, Oct 24, 2024, 8:06 am |
|
Gender neutral restroomsNC-v4 WEc2: Indoor water use reductionposted by Karla Mugica on Oct 11, 2024, 12:43 pm
A project is being worked on that includes gender-neutral bathrooms, which have toilets with the same flow rate (this applies to all bathrooms in the building). The question is: how should this... Last reply: Maria Porter, Oct 24, 2024, 6:53 am |
|
Equipments to be Commissioned for Fundamental CommissioningNC-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by Daisuke Miura on Oct 10, 2024, 9:31 pm
Hi, I have a question regarding the scope of equipments to be commissioned for Fundamental Commissioning. LEED guidelines specifies Mechanical (HVAC&R), plumbing, Electrical (... Last reply: Andrey Kuznetsov, Oct 24, 2024, 6:28 am |
|
Helps with operationsPilot-Credits INpc125: Inclusive Designposted by Husam Haron on Oct 22, 2024, 4:22 am
Just sharing. We're working on a campus with several data center buildings. When the idea of Inclusive Design (called "universal design" - UD in my country) was proposed, there were... Last reply: Nadav Malin, Oct 24, 2024, 6:24 am |