impact of green lease clauses

Pilot-Credits EApc159: Green Leases ACP
posted by Belén Valladares López on Oct 23, 2024, 7:26 am

Dear all

We are drafting a green lease for an office building. Does anyone have experience with the implications of introducing “green” clauses in a commercial lease?

Best

Last reply: Nicole DeNamur, Oct 24, 2024, 1:27 pm

Refrigerant Management Plan Template

NC-v4.1 EAc6: Enhanced Refrigerant Management
posted by Chris Wapelhorst on Oct 23, 2024, 6:11 pm

For v4.1 one of the required uploads to LEEDOnline is a refrigerant management plan. There are some templates from the older versions of LEED, that don't really apply to the new version...

Exterior Lighting TAB for MEP Calculator for Multiple Buildings

NC-v4 EAp2: Minimum Energy Performance
posted by Richard Tran on Sep 27, 2024, 10:06 am

Hello,

I'm currently working on a leed comment back from our LEED Reviewer from this project stating:

"3. Based on the information provided in the Lighting tab, the input reports,...

Last reply: Tyler Thumma, Oct 24, 2024, 9:39 am

LEED v4.1- Third Party Certifications

NC-v4 EQc2: Low-emitting materials
posted by Pablo Jimeno on Mar 26, 2019, 2:26 pm

Hello All,

We are considering adopting LEEDv4.1 requirements for the Low Emitting Materials credit across our projects.

We note that...

Last reply: Dave Hubka, Oct 24, 2024, 9:18 am

Errors in the ASHRAE AEDG Table excel file?

CI-v4 EAc2: Optimize Energy Performance
posted by Mark Terpstra on Sep 30, 2024, 6:06 pm

The workbook available on the USGBC website does not appear to be properly updating when changing the climate zones. Here are some examples for k-12 schools:

  • Climate zone 6 in the...

Last reply: Tyler Thumma, Oct 24, 2024, 8:18 am

What does the "three times the head height" measure mean?

CS-v4 EQc5: Quality Views
posted by Marine Petrosyan on Sep 5, 2023, 10:54 am

There is a requirement for projects with unobstructed views, for regularly occupied floor area within three times the head height. But I can't figure out, and can't find any explanation about how...

Last reply: Nadav Malin, Oct 24, 2024, 8:08 am

Energy modeling of Seconday pump in equest:

NC-v4 EAp2: Minimum Energy Performance
posted by PURUSHOTHAMAN on Oct 9, 2024, 2:08 am

In my project, for the base case as per ASHRAE 90.1-2010 Sys-8, I need to model both the primary and secondary pumps in the chilled water loop. However, in eQUEST, the default loop is created...

Last reply: Tyler Thumma, Oct 24, 2024, 8:06 am

Gender neutral restrooms

NC-v4 WEc2: Indoor water use reduction
posted by Karla Mugica on Oct 11, 2024, 12:43 pm

A project is being worked on that includes gender-neutral bathrooms, which have toilets with the same flow rate (this applies to all bathrooms in the building). The question is: how should this...

Last reply: Maria Porter, Oct 24, 2024, 6:53 am

Equipments to be Commissioned for Fundamental Commissioning

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Daisuke Miura on Oct 10, 2024, 9:31 pm

Hi, I have a question regarding the scope of equipments to be commissioned for Fundamental Commissioning. 

LEED guidelines specifies Mechanical (HVAC&R), plumbing, Electrical (...

Last reply: Andrey Kuznetsov, Oct 24, 2024, 6:28 am

Helps with operations

Pilot-Credits INpc125: Inclusive Design
posted by Husam Haron on Oct 22, 2024, 4:22 am

Just sharing.

We're working on a campus with several data center buildings. When the idea of Inclusive Design (called "universal design" - UD in my country)  was proposed, there were...

Last reply: Nadav Malin, Oct 24, 2024, 6:24 am