Log in
Forum » Credit Forums
Topic

Water Metering for LEED Group: Single Meter for 3 Buildings?

NC-v4 WEp3: Building-level water metering
posted by Mike Refsland on May 22, 2024, 5:36 pm

I'm working on a project pursuing LEED v4 Group, New Construction, with 3 separate buildings in the LEED Group. The design team would like to provide 1 potable water meter that serves all 3...

Question about Innovation: Purchasing- lamps for LEED v4 ID+C

CI-v4 INc1: Innovation
posted by Courtney Royal on Apr 10, 2020, 11:15 am

I am confused, if you wanted to use this credit as an Innovation credit in a v4 ID+C project, does the entire...

Last reply: Catarina Costa Goncalves, May 22, 2024, 11:54 am

Purchasing- Lamps: EXIT signs

NC-v4 INc1: Innovation
posted by Edgar Arevalo on Feb 5, 2024, 3:14 pm

I'm having trouble finding lumens for EXIT signs that are to be included in the Lamp Purchasing calculator.  Pretty much EXIT sign cutsheets do not show lumens because these are EXIT signs and...

Last reply: Catarina Costa Goncalves, May 22, 2024, 11:52 am

No-Cooling Tower for full credit? Option 2- Optimize Water Use for Cooling- 100% Reduction

CS-v4.1 WEc3: Optimize Process Water Use
posted by Grace Friedhoff on Feb 24, 2022, 3:08 pm

I am working on a C&S project that has a baseline system designated for the building using ASHRAE 90.1-2016 Appendix G Table G3.1.1 that includes a cooling tower (system 7) AND there is no...

Last reply: Kathy Collins, LEED AP , WELL AP, May 22, 2024, 9:12 am

Case 2 Demand Response Capable Building with a "future" program

NC-v4.1 EAc4: Grid Harmonization
posted by Chris Flint Chatto on May 27, 2021, 8:11 pm

Is case 2 only available to projects with utilities that don't have...

Last reply: AJ Ahmed, May 22, 2024, 7:21 am

Sound Isolation ACP?

NC-v4 EQc9: Acoustic performance
posted by Brightworks Sustainability on Apr 25, 2017, 7:42 pm

HI all, is anyone familiar with an alternate option for complying with the sound isolation requirements? My project is so close to meeting this but it isn't feasible to provide additional layers...

Last reply: Anna Okviana, May 22, 2024, 2:56 am

Material Quantity Input into EC3

Pilot-Credits MRpc132: Procurement of Low Carbon Construction Materials
posted by Kelli Kimura on Jan 19, 2024, 8:44 pm

Hi all,

We are curious how folks are gathering their material quantities per the pilot credit language "Material quantities shall reflect the final as-built project and be consistently...

Last reply: Atlas Turner, May 20, 2024, 8:06 pm

Option 2- Carshare, requirements

NC-v4.1 LTc7: Reduced parking footprint
posted by Ricardo Sá on Feb 11, 2020, 11:47 am

Dear All,

I have a question regarding Option 2 – Carshare.

Which are the requirements of a parking place in order to be classified as a carshared...

Last reply: Emiliano Ortega, May 20, 2024, 5:20 pm

Pilot-Credits EQpc57: Enhanced acoustical performance- exterior noise control

Pilot-Credits EQpc57: Enhanced acoustical performance - exterior noise control
posted by Olawale Taiwo on Jan 12, 2024, 12:45 pm

Hello Sound & Acoustic Specialist (LEED APs),

Please I need a quick confirmation on this Pilot credit EQpc57.

Does this Pilot credit EQpc57, still apply to LEED v4.1 BD+C:NC...

Last reply: Beatriz Sturm, May 20, 2024, 10:28 am

Arbitrage option

CS-v4 EAc5: Renewable energy production
posted by Glen Boldt on May 17, 2024, 7:09 pm

When using the "arbitrage" option, is there a limit regarding where, geographically, the replacement RECs can be purchased form? Within the USA, do they need to be purchsed from a renewable...

Last reply: Marcus Sheffer, May 17, 2024, 7:35 pm