Forum quick links
recycled % of steel
CS-2009 MRc4:Recycled Contentposted by Vivien Wong on
Hi, we are estimating recycled % of steel, and would like to know if the estimation as shown below is correct or not: 1) steel with catalogue/declare letter showing %postconumer and %preconsumer:
Fire Station FTE
NC-2009 PIf3:Occupant and Usage Dataposted by Rosemary Muller on
Can you verify that FTE requested in PI form 3 is actually FTE per shift?
applying for the Certification before or after the 10 months
CI-2009 EAc2:Enhanced Commissioningposted by Carolina Vergnano on
My doubt is if it´s possible to Certificate a building with the Operation and Maintenance Manual made by the CxA, or if it´s needed to wait the 10 months required for the Enhanced Commissioning. Wo
LEED CI V2012
CI-2009 IDc2:LEED Accredited Professionalposted by Jaewan Lee on
Dear APs I am curious of LEED CI ID category about Accredited Professional points. If I am LEED AP specialty in BD+C then can I still apply to the AP credit? Or should I have certain certification
Alternative Transportation
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by GOVINDACHARI SUNDARARAJAN on
The alternate transportaion specified 2 Bus Lines with in 1/4 Mile distance from site, it is specifed as 2 lines, kindly confirm that this site should be accesible for 2 different bus routes or sim
Chain of custod?
NC-2009 MRc7:Certified Woodposted by Jennifer Ratts on
i am working on a project where a fabricator (who has a CoC) has used another company to assemble a wood cabimet.
Pesticides and herbicides
Healthcare-v2009 IEQc5:Indoor chemical and pollutant source controlposted by Gustavo De las Heras Izquierdo on
The credit literature states: "Minimize the entry of contaminants into the building from vehicles, pesticides, herbicides, [...]" I wonder if the source of pesticides and herbicides should be con
Self-level Screed Underlayment
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Meghan Ward on
Does anyone know if a screed that is applied to concrete slabs prior to installing carpet tiles is considered for this credit and or IEQc4.1/4.2?
Unoccupied workstation
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Gustavo De las Heras Izquierdo on
In our project there is an open office with 10 workstation but only 6 of them are occupied. Nobody is using the other 4 workstations at the moment.