recycled % of steel

CS-2009 MRc4:Recycled Content
posted by  Vivien Wong  on 

Hi, we are estimating recycled % of steel, and would like to know if the estimation as shown below is correct or not: 1) steel with catalogue/declare letter showing %postconumer and %preconsumer:

2
Default Avatar
LEEDuser Expert
472 thumbs up
Fri May 30, 2014, 8:31 am

Fire Station FTE

NC-2009 PIf3:Occupant and Usage Data
posted by  Rosemary Muller  on 

Can you verify that FTE requested in PI form 3 is actually FTE per shift?

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Fri May 30, 2014, 4:01 am

applying for the Certification before or after the 10 months

CI-2009 EAc2:Enhanced Commissioning
posted by  Carolina Vergnano  on 

My doubt is if it´s possible to Certificate a building with the Operation and Maintenance Manual made by the CxA, or if it´s needed to wait the 10 months required for the Enhanced Commissioning. Wo

6
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Fri May 30, 2014, 1:13 am

LEED CI V2012

CI-2009 IDc2:LEED Accredited Professional
posted by  Jaewan Lee  on 

Dear APs I am curious of LEED CI ID category about Accredited Professional points. If I am LEED AP specialty in BD+C then can I still apply to the AP credit? Or should I have certain certification

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu May 29, 2014, 11:43 pm

Alternative Transportation

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  GOVINDACHARI SUNDARARAJAN  on 

The alternate transportaion specified 2 Bus Lines with in 1/4 Mile distance from site, it is specifed as 2 lines, kindly confirm that this site should be accesible for 2 different bus routes or sim

2
Thu May 29, 2014, 10:45 pm

Chain of custod?

NC-2009 MRc7:Certified Wood
posted by  Jennifer Ratts  on 

i am working on a project where a fabricator (who has a CoC) has used another company to assemble a wood cabimet.

4
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Thu May 29, 2014, 10:03 pm

Pesticides and herbicides

Healthcare-v2009 IEQc5:Indoor chemical and pollutant source control
posted by  Gustavo De las Heras Izquierdo  on 

The credit literature states: "Minimize the entry of contaminants into the building from vehicles, pesticides, herbicides, [...]" I wonder if the source of pesticides and herbicides should be con

3
Thu May 29, 2014, 5:39 pm

Self-level Screed Underlayment

CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Meghan Ward  on 

Does anyone know if a screed that is applied to concrete slabs prior to installing carpet tiles is considered for this credit and or IEQc4.1/4.2?

2
Thu May 29, 2014, 3:55 pm

Unoccupied workstation

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Gustavo De las Heras Izquierdo  on 

In our project there is an open office with 10 workstation but only 6 of them are occupied. Nobody is using the other 4 workstations at the moment.

2
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Thu May 29, 2014, 3:53 pm