Does energy model should include walls to be consistent w/ Plf2
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Dem on
I am working on a project (2 story office building) as a LEED AP & architect and received Preliminary Design Package comments from GBCI.
"Single Site" requirement for a Master Site?
posted by Richard Barlow on
We are working on a 30+ acre medical campus for a single developer. There will be a total of 9 buildings in this development, and all buildings will pursue LEED certification.
Hot-Rolled Structural Steel - MRc4 Products
NC-2009 MRc4:Recycled Contentposted by Robert East on
I am working as part of a Q.A. team at an Integrated Steel Complex in the Middle East which operates 3 core manufacturing plants; 1. Direct Reduction Plant producing Direct Reduced Iron (DRI); 2.
LEED AP BD+C V4
posted by Marie-Pierre Pare on
Dear Tristan, I did the LEED Green Associate exam right before the change of version. I have only used one book to study (Gang Chen).
Ice-cream factory with sub-zero working conditions
NC-2009 IEQc7.1:Thermal Comfort—Designposted by André Harms on
Good day, The project I'm working on is an ice-cream factory which will have staff working for short spells (but more than 15min) in spaces cooled to down to -40C.
New Construction vs Major Renovation
NC-2009 EAp2:Minimum Energy Performanceposted by Ritwik Kakati on
Our project consists of renovation of 140,000 SF of an existing building, as well as the addition of 30,000 SF of new space.
Auto Service/Repair
NC-2009 SSc2:Development Density and Community Connectivityposted by R W on
Would an auto service/repair business count as a basic service? What about a place that sells landscaping materials? Insurance Brokers? Skatepark? Thanks!
Process load significantly lower than 25%
NC-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
The overall process load of our project turns out to be in the vicinity of 15% only. We are aware that 15% is absurdly low and unusual for plants.
Minimum Ventialtion Rates: Locker Rooms
NC-2009 IEQp1:Minimum IAQ Performanceposted by Lawrence Lile on
I am working on a project which has an employee locker room, where truck drivers will come to change or shower after their shifts once a day.
Mandatory provision 5.4 for existing building
NC-2009 EAp2:Minimum Energy Performanceposted by Charalampos Giannikopoulos on
For an existing building under major renovation would the mandatory provision 5.4.3.4 for vestibules be still applicable even if the project scope does not include any additions or plan modificatio