IEQp1 in international settings

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Tristan Roberts on Dec 21, 2009, 2:06 pm

A couple of our readers posted questions in this space asking for specific guidance on applying IEQp1 in international settings, dealing specifically with ASHRAE-62 issues. I apologize, but those...

Last reply: Jean Marais, Feb 11, 2010, 1:35 am

Applicability of published ID credit catalog

NC-2009 IDc1: Innovation in Design
posted by Joanna Jenkins on Feb 10, 2010, 9:57 am

There is a link to the Innovation in Design Credit Catalog on this site (thank you!) Can anyone clarify for me whether or not the ID credits listed as Accepted ("A") in this catalog are still...

Last reply: Nadav Malin, Feb 10, 2010, 7:48 pm

The Carbon Trust Good Practice Guide 237 — Natural Ventilation

NC-2009 IEQc2: Increased Ventilation
posted by Jean Marais on Feb 10, 2010, 12:28 pm

The Carbon Trust Good Practice Guide 237 — Natural Ventilation in Non-Domestic Buildings — a Guide for Designers, Developers and Owners

I can't find it. Not in the links given or using...

Last reply: Christopher Schaffner, Feb 10, 2010, 2:39 pm

Interior Lighting- no "Non-business hours"

NC-2009 SSc8: Light Pollution Reduction
posted by Lauren Sparandara on Feb 10, 2010, 2:28 pm

I am working on a project that runs 24-7, every day of the year. Has anyone heard of exceptions made in terms of meeting the Interior Lighting requirement that "all non-emergency interior...

We have a situation where the

NC-2009 MRc2: Construction Waste Management
posted by Andrea Anderson on Feb 9, 2010, 10:31 am

We have a situation where the contractor wants each subcontractor to remove their own waste and haul it back to their own base of operations. Here, the waste will hopefully be reinserted into the...

Last reply: Tristan Roberts, Feb 9, 2010, 2:49 pm

EAp2 vs EAc1

NC-2009 EAc1: Optimize Energy Performance
posted by Leandro Silva on Feb 6, 2010, 11:12 am

Please, correct me if I am wrong!
As I understand it, the energy simulation requirements of EAp2 and EAc1 are NOT identical. If I am correct, for EAp2 you:

Model the proposed design...

Last reply: Christopher Schaffner, Feb 8, 2010, 12:28 pm

Water Efficiency Calculation question

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by Bruce Truong on Feb 4, 2010, 11:18 am

HI, We are going at this LEED process ourselves here at Tufts Health Plan and I have a minor question regarding LEED baseline for shower heads. My question: We have about 1700 employees here...

Last reply: Jenny Carney, Feb 7, 2010, 4:31 pm

Desk Lamps

EBOM-2009 MRc2: Sustainable Purchasing—Durable Goods
posted by Reynaldo Castro on Feb 4, 2010, 11:40 am

When buying desk lamps, would having Energy Star rated light bulbs be sufficient enough? Or do the actual lamps have to be Energy Star rated?

Last reply: Jenny Carney, Feb 6, 2010, 7:10 pm

Off-site labor costs

NC-2009 MRc4: Recycled Content
posted by Mara Baum on Feb 5, 2010, 9:23 pm

To what extent is shop labor included in material costs? With increases in shop fabrication, this could be a big issue. Clearly there is labor that goes into the manufacture of every product,...

Last reply: Nadav Malin, Feb 6, 2010, 9:44 am

Interior Light Leak Reduction- High Bay Warehouse

NC-2009 SSc8: Light Pollution Reduction
posted by Dan Prows on Feb 5, 2010, 3:51 pm

Hello all,

Regarding light leaking from a high...