Forum quick links
Do I include plumbing fixtures in the materials scope
NC-2009 MRc4:Recycled Contentposted by Erika Duran on
Hi I know accessories are included but are actual plumbing fixtures included in these calcs? They are not with Divs 3-10
Data Center in on Office building Energy Modelling Calculations
NC-2009 EAc1:Optimize Energy Performanceposted by ESRA OZKONUKSEVER on
Hi all, We re currently working on an office building project of 10.000 square meters and within the building there is a data center as big as 150 square meters. we are plannig to apply v2009 NC.
documenting Option 3, share energy/water usage
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Courtney Royal on
if our CS project goes with option 3, what space usage data will the mgmt company, who will only control the common areas (after building is complete) be required to share?
Envelope materials with no provided u-values
NC-2009 EAp2:Minimum Energy Performanceposted by John Covello on
Hello, On our project we are getting supplied from local contractors materials like sandstone, granite, reused teak wood, and limestone.
Auditorium Seating
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Kai Starn on
Hello, Our team is currently working on a CI project going for IEQ 4.5. We are in the stages of the submittal process and just recently a submittal for auditorium seating came in.
Mechanical Ventilation using local code
NC-2009 IEQp1:Minimum IAQ Performanceposted by MOHD HAFIZI MOHAMAD on
Hi. Is it a compulsory to design mechanical ventilation by using local code even if ASHRAE Standard is more stringent in order to score IEQ Credit 2: Increased Ventilation? I got a problem to sco
Plastic Cement Welding & PVC Welding
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Lilian Seow on
Page 509-LEED Reference Guide 2009-SCAQMD 1168 [2005]-Table 1 shows the VOC limits for: PVC Welding - 510 g/l Plastic Cement Welding - 250 g/l Most common brands/manufacturers like Oatey, Ipex, We
Plenum Return Systems
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Nate Maniktala on
Hi All, Compliance with this credit in fully ducted return systems has been straight forward, however, the LEED Reference Guide is not too clear on how exactly open plenum return systems are to be
Two new buildings joined by unconditioned walkway
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by P Fanfulik on
I have a new bus garage (maintenance and admin offices) connected to the fuel/wash building by an open air bridge (unconditioned space).
Runoff/Gully Water
NC-2009 WEc1:Water Efficient Landscapingposted by Tamary Alvarez on
Our project's environmental site assessment has documented a gully resulting from the runoff of the adjacent site dumping into our site.