Saving percentage round up to the nearest integer?

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

Will LEED round up the saving percentage to the nearest integer? e.g. 19.8% to 20%? Thanks in advance

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Feb 27, 2015, 2:34 pm

Epoxy floor. Testing laboratories

CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Irina Charkina  on 

Hello, We have a project in Russia under LEED for CS-2009 sertification. There are technical rooms with epoxy flooring. 1) Can anybody confirm if I am wrong or right?

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Fri Feb 27, 2015, 9:11 am

Envelope Commissioning for a Major Renovation

NC-v4 EAc1:Enhanced commissioning
posted by  Eleni Tsivitzi  on 

Does anyone have experience doing envelope commissioning for an existing building? The project will be a Major Renovation with fairly extensive HVAC upgrades.

3
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Thu Feb 26, 2015, 9:20 pm

LEED CI - deadline for submitting documentation

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Devanand Ragbir  on 

We registered the Project for LEED CI. A space of about 2000 sqft. As the space was small the client was able to outfit the space in 3 weeks time and occupied the space immediately after.

4
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Thu Feb 26, 2015, 8:48 pm

Final M&V Report

NC-2009 EAc5:Measurement and Verification
posted by  Valerie Walsh  on 

We would like to know if the project can obtain its LEED certification prior to submitting the Final M&V Report, which is dependent upon 1 year of post-occupancy energy use data.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Feb 26, 2015, 8:11 pm

Tenant Lease or Sales Agreement

CS-2009 WEp1:Water Use Reduction
posted by  Curt Pascoe  on 

Is there any way to complete a legally binding document when there is no tenant identified? If I am constructing a building, but not installing fixtures, then an agreement is required.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Feb 26, 2015, 6:02 pm

Domestic Hot Water System

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Keerthi Ratnayake  on 

Is it a mandatory requirement to install a domestic hot water system in a LEED project?

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Thu Feb 26, 2015, 5:11 pm

Captured rainwater for flushing toilets- WE Cr.3

CS-2009 WEc3:Water Use Reduction
posted by  Tomas Kurka  on 

Hello, I have a question regarding project of office building in Prague( LEED 2009 CS). I didnt find anywhere how to add into WE Cr.3 LEED ON-LINE Form the amount of rainwater used for flushing to

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Feb 26, 2015, 2:52 pm

Unrenovated gross square footage

NC-2009 PIf2:Project Summary Details
posted by  Joseph Greene  on 

Our project is an addition to an existing building.

2
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Thu Feb 26, 2015, 1:19 pm

Views for Inpatients - 90% of ...?

Healthcare-v2009 IEQc8.2:Daylight and views - views
posted by  Maya Karkour  on 

Hi All, is there a discrepancy between the credit language and the leedonline form for IEQc8.2 - Views for Inpatients? 1- if we refer to the leedonline form, % of inpatient perimeter area with acce

2
Thu Feb 26, 2015, 7:54 am