Forum quick links
Labs21
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Gustavo De las Heras Izquierdo on
Hallo, We are certifying a LEED EBOM project composed of 28% laboratory and 72% office. The Case 2, Option 1 Labs is asking to enter to parameters: i.This Project Building's annual weather nor
Integrative Process Credit for Healthcare and Hospitality Projec
CS-v4 IPc1:Integrative processposted by Jeslin Varghese on
The LEED v4 rBD+C reference guide I have says the credit is worth 1 point for all project adaptations except Healthcare and Hospitality. It says 1-5 points on the credit title page.
Required Manufacturer Documentation for Option 3
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Randy Van Straaten on
Is there more guidance available for manufacturers on the documentation necessary for their products for this products. For instance how along the "supply chain" do they need to go.
Auto Dealership
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Vince Capogna on
Would exterior on-site inventory/display parking of new cars for sale at an auto dealership count towards the total number of parking spots provided?
Equipment Capacities
CS-2009 EAp2:Minimum Energy Performanceposted by Giuseppina Amorusi on
I am working on simulation with Carrier's HAP. I have to model baseline system 8 (VAV with PFB boxes) in accordance to ASHRAE 90.1 Appendix G 2007.
Juvenile Detention Center - Lighting Control
NC-v4 EQc6:Interior lightingposted by Michelle Bombeck on
Hello all - We are working on a juvenile detention center and are trying to find a way to comply with EQc6.2.
Area requirements
Pilot-Credits SSpc82:Local food productionposted by Noriko Nagazumi on
The requirements on the credit (BD+C) on the top of the page show: 1. At least 10% of the site’s vegetated area 2. At least 1,500 square feet of hydroponic area 3.
Green tags and Tradable Renewable Credits (TRCs)?
NC-v4 EAc7:Green power and carbon offsetsposted by Jen Roberts on
Can green tags or TRCs can be used to substitute RECs? Also, I am having a hard time understanding the concept of how RECs work.
LEED 2009 Energy Updates
NC-2009 EAc1:Optimize Energy Performanceposted by Theresa Lehman on
Did anyone see the that USGBC has launched a set of proposals to increase the energy minimums for LEED v2009, which is open for project registration until October 31, 2016.
EAC4 Template Life Cycle
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Jesus Deras on
For refrigeration equipment(Freezers/coolers etc etc) what is the life expectancy that should be put into the EAC4 template?