We are working on a college campus building. While the typical project is expected to be on a site that was remediated, our project is in a building that goes through partial asbestos abatement with each CI project. While this is allowed with Addenda 11/3/2010 I'm not sure how to best document it. Currently, SSc1 is expected to be documented during the Design Phase. We will not be able to submit the required paperwork for this part of Opt 2 until after construction is done. The templates no longer allow you to defer Design credits to the Construction Phase easily. In the past we've actually been told we hade to pay a Design Review Appeal fee if we submit Design credits after that review has been completed. We are submitted a split review. How should we go about documenting the asbestos abatement? Thank you.