Forum quick links
Case 1 - Grouping the space types
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by satheesh M on
Hi, we are working for the project with multiple tenants. we could not collect all the floors HVAC layouts. but we have the AHU details.
Existing Building Baseline WWR
NC-2009 EAc1:Optimize Energy Performanceposted by Christian Kaltreider on
Referencing 90.1 Table G3.1.5: I understand that the envelope for an existing building baseline model should reflect existing conditions concerning thermal properties of walls and windows.
Applicable credits for chemical free cooling tower maintenance
EBOM-2009 WEc4:Cooling Tower Water Managementposted by Julie Klein on
I am looking at a chemical free cooling tower maintenance system that returns huge water savings. Is there a threshold on the number of credits for one facility component?
Dormitory Project- Single Bedrooms like Private Offices
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Emma Leonard on
I am working on a dormitory project with mainly single bedrooms. Can I count these rooms like private offices and not have to calculate the actual area in each space?
Linen Area
Healthcare-v2009 IEQp1:Minimum indoor air quality performanceposted by Gabriela Crespo on
Hi! I have a question regarding the ventilation requirement for the Linen Area, according to the Space Matrix file, there needs to be Outdoor air for this space.
Outside Mat
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Waterset CDD on
Hello, We have an outside mat that needs to be replaced. It was actually glued down during instillation. I would like to know the following: 1.
Museum Exhibit Lighting
NC-2009 EAc1:Optimize Energy Performanceposted by Christian Kaltreider on
I am modeling a museum with separately controlled exhibit lighting. I am using Section 9.6 of 90.1 2007 (space by space) to calculate my baseline general lighting power densities.
Waste Oil Fuel
NC-2009 EAp2:Minimum Energy Performanceposted by Michael Daly on
I am working on a project that has two parts to the building. There is an office component and a shop component. The office is going to be heated and cooled with a VRF system.
Perimeter protection
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Martin Meehan on
We have a number of LEED projects in infill locations in Ireland. Since we don't really have a standard code for site Erosion and Sedimentation we have to stick to the U.S.
Base Build HVAC Plant Requirements
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Ciaran McCabe on
Hi, I am working on a CI 2009 fit out where the the landlord services such as heating pumps, boilers, AHU's and chillers are already installed.