Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Case 1 - Grouping the space types

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  satheesh M  on 

Hi, we are working for the project with multiple tenants. we could not collect all the floors HVAC layouts. but we have the AHU details.

4
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Tue Feb 16, 2016, 6:34 pm

Existing Building Baseline WWR

NC-2009 EAc1:Optimize Energy Performance
posted by  Christian Kaltreider  on 

Referencing 90.1 Table G3.1.5: I understand that the envelope for an existing building baseline model should reflect existing conditions concerning thermal properties of walls and windows.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Feb 16, 2016, 5:58 pm

Applicable credits for chemical free cooling tower maintenance

EBOM-2009 WEc4:Cooling Tower Water Management
posted by  Julie Klein  on 

I am looking at a chemical free cooling tower maintenance system that returns huge water savings. Is there a threshold on the number of credits for one facility component?

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Feb 16, 2016, 5:30 pm

Dormitory Project- Single Bedrooms like Private Offices

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Emma Leonard  on 

I am working on a dormitory project with mainly single bedrooms. Can I count these rooms like private offices and not have to calculate the actual area in each space?

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Tue Feb 16, 2016, 3:00 pm

Linen Area

Healthcare-v2009 IEQp1:Minimum indoor air quality performance
posted by  Gabriela Crespo  on 

Hi! I have a question regarding the ventilation requirement for the Linen Area, according to the Space Matrix file, there needs to be Outdoor air for this space.

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Mon Feb 15, 2016, 3:38 pm

Outside Mat

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Waterset CDD  on 

Hello, We have an outside mat that needs to be replaced. It was actually glued down during instillation. I would like to know the following: 1.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Feb 12, 2016, 5:31 pm

Museum Exhibit Lighting

NC-2009 EAc1:Optimize Energy Performance
posted by  Christian Kaltreider  on 

I am modeling a museum with separately controlled exhibit lighting. I am using Section 9.6 of 90.1 2007 (space by space) to calculate my baseline general lighting power densities.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Feb 11, 2016, 9:54 pm

Waste Oil Fuel

NC-2009 EAp2:Minimum Energy Performance
posted by  Michael Daly  on 

I am working on a project that has two parts to the building. There is an office component and a shop component. The office is going to be heated and cooled with a VRF system.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Feb 11, 2016, 9:49 pm

Perimeter protection

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Martin Meehan  on 

We have a number of LEED projects in infill locations in Ireland. Since we don't really have a standard code for site Erosion and Sedimentation we have to stick to the U.S.

3
Default Avatar
Principal
Meehan Associates
LEEDuser Basic Member
14 thumbs up
Thu Feb 11, 2016, 6:22 pm

Base Build HVAC Plant Requirements

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Ciaran McCabe  on 

Hi, I am working on a CI 2009 fit out where the the landlord services such as heating pumps, boilers, AHU's and chillers are already installed.

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Feb 11, 2016, 5:41 pm