Hello, I wonder how should I understand Opt.2 BD+C
Rain water Mgmt credit.
"Manage on site the annual increase in runoff volume from the natural land cover condition to the post-developed condition."
Does that mean that I should design the site so that it can help increase annual runoff volume and stays in such condition all the way thru post-developed condition, given the base line is "natural land cover condition" ?