Post a question or comment
Filter by location
Forum
Topic
Replies
Recent
2
Tue Mar 29, 2016, 3:29 pm

submetering general requirements and strategy for metering HVAC

CI-2009 EAc3:Measurement and Verification
posted by  Rob Pinkston  on 

Hello, We are working on a low-rise office building and pursuing LEED CS v2009 for the base-building and LEED CI v2009 for at least one of the tenant spaces.

2
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Tue Mar 29, 2016, 3:08 pm

Fiberglass Fiberboard Adhered to NAUF MDF

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Andrée Iffrig  on 

One of our clients is planning to use a tackable fabric tile composed of NAUF MDF, fiberboard (fiberglass with a urea formaldehdye resin), UF-free adhesive and fabric. The tile is like a sandwich.

2
Mon Mar 28, 2016, 6:36 pm

Adhesive credits

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Patricia Taylor  on 

As a Flooring contractor, I get many customers that request we submit LEED information many different ways. A couple have asked that I break out the qty and total material cost for adhesives.

4
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Mon Mar 28, 2016, 12:14 pm

tenant submetering?

CI-2009 EAc3:Measurement and Verification
posted by  Courtney Royal  on 

We have a LEED-CI project occupying one floor of a building, but the project space will be occupied by multiple tenants.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Mar 28, 2016, 3:52 am

Dimension of entryway systems

EBOM-v4 EQc2:Enhanced indoor air quality strategies
posted by  LEED Pro Consultant  on 

Hi, We are trying to apply this credit in a small office building, so we want to know if the dimension of entryway systems can be modified due to three meters is a very large distance in a building

2
Principal
Sustainable Integration LLC
LEEDuser Basic Member
12 thumbs up
Thu Mar 24, 2016, 9:12 pm

Cost Savings from an Owner PPA

NC-2009 EAc1:Optimize Energy Performance
posted by  David Hart  on 

If an owner constructs a remote net-metered PV system as part of a power purchase agreement (PPA), can the PPA cost savings be used to increase the efficiency (cost) savings vs.

3
Thu Mar 24, 2016, 4:35 pm

NSF 140 Gold vs Platinum

CI-2009 IDc1:Innovation in Design
posted by  Kristine Byers  on 

We are considering an ID Credit for having all of the carpet on the project NSF 140 Certified. My questions: 1. Is this ID Credit still available for CI2009? 2.

7
Default Avatar
LEEDuser Expert
472 thumbs up
Thu Mar 24, 2016, 2:01 pm

Definition of one building

NC-2009 PIf2:Project Summary Details
posted by  Cindy Quinn  on 

What is the definition of one building? Specifically, how much connection between two building portions must there be in order for LEED to consider it one building?

5
Default Avatar
Principal
Ecological Environments, LLC
LEEDuser Premium Member
14 thumbs up
Thu Mar 24, 2016, 1:00 am

Exhaust for Hazardous Material storage

Healthcare-v2009 IEQp1:Minimum indoor air quality performance
posted by  Gabriela Crespo  on 

Hi guys! I have a two part question on the Hazardous Materials Storage ventilation requirements according to ASHRAE 170. 1.

2
Wed Mar 23, 2016, 10:21 pm