Leakage Rate in v5 Form

EBOM-2009 EAc5:Enhanced Refrigerant Management
posted by  Andy Rhoades  on 

My understanding is that the minimum acceptable Leakage Rate is 0.5%, even if the actual data demonstrate a lower leakage rate.

5
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Mon May 9, 2016, 7:23 pm

Two story atrium - include 2nd floor in gross area calculations?

NC-2009 PIf4:Schedule and Overview Documents
posted by  Anna Korinkova  on 

We have a project that has a two story atrium, running across the 1st and 2nd floor. Is the 2nd floor atrium (empty) space included in the gross area calculations or not?

2
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Mon May 9, 2016, 5:50 pm

Carrier air to water chiller (non standard (ARI) testing)

CS-2009 EAp2:Minimum Energy Performance
posted by  David Lazaro  on 

I would like to check if the Carrier model 30RQ0262 (COPc=2,62 according ARHI test 550/590 despite ASHRAE requires ARI 340/360) will meet that Mandatory Provisions in terms of Equipment Efficiency.

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon May 9, 2016, 2:08 pm

Baseline HVAC System

CS-2009 EAc1:Optimize Energy Performance
posted by  Ciaran McCabe  on 

We are using packaged VAV with reheat system 5 for the Baseline System.

3
Director
Passive Dynamics Sustainability Consultants
LEEDuser Basic Member
12 thumbs up
Mon May 9, 2016, 1:25 pm

Air - Water Heat Pumps

CS-2009 EAp2:Minimum Energy Performance
posted by  Giuseppina Amorusi  on 

Hi all, I need to model in Energy Plus several "Air - Water Heat Pumps": heat pumps that use air as energy source and water as fluid for conditioning.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon May 9, 2016, 10:07 am

Option 2 Calculation Question

NC-2009 MRc5:Regional Materials
posted by  Haley Duncan  on 

When calculating distances from location of extraction and location of manufacturing to project site, is it "as the crow flies" or actual travel distance?

5
Default Avatar
Assistant Engineer
Turner Construction MIT.nano
LEEDuser Premium Member
1 thumbs up
Sat May 7, 2016, 2:09 am

Which credit does poured resinous flooring fall into?

Schools-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Kyle Strock  on 

We are using a resinous flooring system in some restrooms. It does not seem to meet the Green Seal definintion of "Coating" since it includes aggregate and color chips.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri May 6, 2016, 7:47 pm

ETo Unit

NC-2009 WEc1:Water Efficient Landscaping
posted by  GISELA FARHAT DE ARAUJO  on 

I would like to know which unit of measurement should include the value of ETO (Reference evapotranspiration rate). Im Brazil we normaly use mm. should i put in Inches?

6
Fri May 6, 2016, 5:51 pm

Central PV system distribution to one LEED target building

NC-2009 EAc2:On-Site Renewable Energy
posted by  Hongyun Zhou  on 

I am working on a single building LEED project in an industry park, which has a central PV system inside.

6
Architect - Cx Provider - Building Performance Specialist
GLHN Architects & Engineers
LEEDuser Premium Member
25 thumbs up
Fri May 6, 2016, 4:27 pm

precerticfiation

General forums
posted by  Tristan Roberts  on 

Do you have a copy of the BD&C Reference Guide? CS Appendix 5 discusses precertification.

5