Forum quick links
On-site exercise facilities on a corporate campus
Pilot-Credits EQpc78:Design for active occupantsposted by Sara Goenner Curlee on
My project is on a corporate campus. The corporation is a big proponent of employee health and fitness.
Classifying Floors for Re-entry
Pilot-Credits EQpc78:Design for active occupantsposted by Sara Goenner Curlee on
I received back the following as part of the review comments: "Provide signage indicating that the floors are classified for re-entry." What kind of signage are talking about?
Re-roofing by Owner was done before starting our project
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Paul Duffy on
We are renovating a university building with goal of silver certification.
Fan and Coil Units
CS-2009 IEQc3:Construction IAQ Management Plan—During Constructionposted by Gabriela Hernández Castillo on
Is there any MERV requirement for Fan and Coil unit? We are specifying for MERV 6 in fan and coil units and we would like to know if that would mean not achieving the credits requirements.
Water Reduction credit points for for ID +C seem unusually high
CI-v4 WEc1:Indoor water use reductionposted by Kerry Honsinger on
We are working on a project where the building exists and are finishing out the interior, thus ID +C.
Integrative process
Pilot-Credits PC60:Integrative Processposted by Habitech Distretto Tecnologico Trentino on
I find this credit really interesting and it is very important to have this as a prerequisite for LEEDv4
Exterior Applied Products: paving and athletic surfaces
NC-v4 EQc2:Low emitting materialsposted by Allison Zuchman on
How should exterior paving and play surfaces be addressed in the Low-Emitting credit, Exterior Applied Products product category?
100% well or non-potable water
EBOM-v4 WEc3:Cooling tower water useposted by Elizabeth Dunn on
Our building uses 100% well or non-potable water.
Automatic Storage & Retrieval System and Warehouse
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Vinoth Muthusamy on
Project consist of 5 Storey Warehouse & 1 storey ASRS (Automatic Storage & Retrieval System). Both are connected in each floor to facilitate the movement of goods.
Enhanced EPD program
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Akira Kataoka on
I understand that USGBC are seeking feedbacks from stakeholders on the draft EPD guidance. When is the final version scheduled to be ready and when would the guidance become effective?