Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Can roofed areas be considered open space?

CS-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Alejandro Rivera  on 

Our project is a mixed-used building in an urban area that will most probably earn SSc2.

3
Chief Consulting Officer
NÁRUM Consult
LEEDuser Basic Member
0 thumbs up
Mon Mar 20, 2017, 4:58 pm

Weld-Thru Primer

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Celimar Fournier  on 

Our structural steel subcontractor is currently using a Sherwin Williams Weld-Thru Primer at the shop location. This is for anti-corrosive/rust purposes.

3
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Mon Mar 20, 2017, 1:58 am

ATES in combination with HP

NC-v4 EAc5:Renewable energy production
posted by  Ydo Schuuring  on 

We would like achieve points for the credit: Renewable Energy Production. The design team is considering an Aquifer Therma Energy Storage (ATES) in combination with a heatpump.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Mar 17, 2017, 10:18 pm

Credits in addition to Optimize Energy Performance?

NC-v4 EAc5:Renewable energy production
posted by  Dianne Herrin  on 

Hi - Our solar system is adding two points to our "optimize energy performance" category due to the cost offset.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Mar 17, 2017, 9:55 pm

porcelain tiles

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Neetika Parmar  on 

Hi, our project is installing porcelain tiles which are certified by eco label, green building council italia and singaporian green building.

3
Fri Mar 17, 2017, 8:42 pm

Tyroc subflooring?

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Courtney Royal  on 

I have a project which wants to use Tyroc subflooring, has anyone heard or used this product? This product is not a finished flooring product or FloorScore or Greenguard certified.

6
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Fri Mar 17, 2017, 8:34 pm

Extraction Monoxide in Basement During Construction

CS-2009 IEQc3:Construction IAQ Management Plan—During Construction
posted by  Alan Viale  on 

we have a project of 20 floors of offices; and has 10 parking basements by local regulations. The design of parking in basements requires extraction monoxide. Currently is under construction and h

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Mar 17, 2017, 7:09 pm

MPR Supplemental Guidance Clarification

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Brian Bartholomew  on 

Regarding MPR2, the "Supplemental Guidance to the Minimum Program Requirements (Revision 2)", on page17 Article III.1) is titled "VERTICALLY ATTACHED, LEED-EB: O&M, AND MAJOR RENOVATION PROJECT

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Fri Mar 17, 2017, 5:04 pm

Shuttle Services

NC-v4 LTc5:Access to quality transit
posted by  sriram tetali  on 

Dear All can any one suggest whether we can claim the Shuttle services provided by client in the LTc4 or LTc5 credits in LEED v4 NC Rating system Thanks & Regards sriram

2
Fri Mar 17, 2017, 11:26 am

Synthetic grass surfacing

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  David Browne  on 

I have an indoor football practice facility under review. The facility consists of a covered football field and a "head house" containing toilets, training rooms, etc.).

4
Default Avatar
Architect
CRA Associates, Inc.
LEEDuser Premium Member
5 thumbs up
Thu Mar 16, 2017, 1:50 pm