Building Envelop Requirement on Manufacturing facility
NC-2009 EAp2:Minimum Energy Performanceposted by Xun Jia on
I am working on a winery facility which includes office spaces and manufacturing spaces. Does LEED NC require the building envelop parameters (e.g.
Non-Enclosed Garage
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by AshLee Eustace on
We have a non-enclosed above ground garage space on the first few floors of a multi-family building which is naturally ventilated.
Cork Plank Flooring
CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Michelle Rosenberger on
Is cork plank flooring a hard surface flooring requiring FloorScore certification?
O1:Interior Lighting Power Density part of Mandatory Provisions?
CS-2009 EAp2:Minimum Energy Performanceposted by Marco Abdallah on
We are pursueing OPTION 1 (Whole Building Simulation). Thus we also have to comply to the mandatory provisions, e.g. section 9.4 for lighting.
ventless fireplace
NC-2009 IEQp1:Minimum IAQ Performanceposted by Jill Ziegler on
I'm working on a stand-alone "amenity/community center" adjacent to an apartment buliding, and it will feature a gas fireplace in a common room.
4th comment period open
posted by Tristan Roberts on
The 4th comment period is here! I've opened a new forum devoted to the new draft that is out, and the balloting process.
VAV system required for small DX?
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Daniel Thien on
I am researching option 1 for Advanced building requirements. We are working in a 1 story industrial park and are installing new 10 ton and below DX RTUs.
Urinal Metered Faucet
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Luis Lagomarsino on
We are working on a project that will include metered urinal faucets with an adjustable 4 - 10 seconds timer.
Opaque skylights
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
In the building which I’m modelling there are plastic skylights which are practically opaque.
LEED MV Credits compliance with Option D
NC-2009 EAc5:Measurement and Verificationposted by Ameet AA on
To achieve this credit, during the CONSTRUCTION Stage we just have to submit the IPMVP-OPTION D compliant Measurement and Verification Plan together with Diagram showing the locations of any meter