Building Envelop Requirement on Manufacturing facility

NC-2009 EAp2:Minimum Energy Performance
posted by  Xun Jia  on 

I am working on a winery facility which includes office spaces and manufacturing spaces. Does LEED NC require the building envelop parameters (e.g.

5
Wed May 16, 2012, 5:19 pm

Non-Enclosed Garage

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  AshLee Eustace  on 

We have a non-enclosed above ground garage space on the first few floors of a multi-family building which is naturally ventilated.

3
Default Avatar
Sales and Marketing Executive Assistant
Sustainable Solutions Corporation
LEEDuser Basic Member
33 thumbs up
Wed May 16, 2012, 3:19 pm

Cork Plank Flooring

CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Michelle Rosenberger  on 

Is cork plank flooring a hard surface flooring requiring FloorScore certification?

8
Technical Information & Public Affairs Manager
UL Environment
LEEDuser Basic Member
356 thumbs up
Wed May 16, 2012, 3:18 pm

O1:Interior Lighting Power Density part of Mandatory Provisions?

CS-2009 EAp2:Minimum Energy Performance
posted by  Marco Abdallah  on 

We are pursueing OPTION 1 (Whole Building Simulation). Thus we also have to comply to the mandatory provisions, e.g. section 9.4 for lighting.

5
Wed May 16, 2012, 1:14 pm

ventless fireplace

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Jill Ziegler  on 

I'm working on a stand-alone "amenity/community center" adjacent to an apartment buliding, and it will feature a gas fireplace in a common room.

3
Principal, Energy and Engineering Leader
DLR Group | Westlake Reed Leskosky
LEEDuser Expert
267 thumbs up
Wed May 16, 2012, 11:35 am

4th comment period open

General forums
posted by  Tristan Roberts  on 

The 4th comment period is here! I've opened a new forum devoted to the new draft that is out, and the balloting process.

12
LEED Fellow 2011, Principal
Kath Williams + Associates
LEEDuser Premium Member
104 thumbs up
Wed May 16, 2012, 12:54 am

VAV system required for small DX?

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Daniel Thien  on 

I am researching option 1 for Advanced building requirements. We are working in a 1 story industrial park and are installing new 10 ton and below DX RTUs.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue May 15, 2012, 10:04 pm

Urinal Metered Faucet

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Luis Lagomarsino  on 

We are working on a project that will include metered urinal faucets with an adjustable 4 - 10 seconds timer.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue May 15, 2012, 7:02 pm

Opaque skylights

NC-2009 EAc1:Optimize Energy Performance
posted by  Francesco Passerini  on 

In the building which I’m modelling there are plastic skylights which are practically opaque.

3
Tue May 15, 2012, 5:50 pm

LEED MV Credits compliance with Option D

NC-2009 EAc5:Measurement and Verification
posted by  Ameet AA  on 

To achieve this credit, during the CONSTRUCTION Stage we just have to submit the IPMVP-OPTION D compliant Measurement and Verification Plan together with Diagram showing the locations of any meter

2
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Tue May 15, 2012, 4:49 pm