"Planned Method for gathering feedback on Occupant Satisfaction"?

CI-v4 IPc1:Integrative process
posted by  Kathleen Sandberg  on 

What criteria do we have to include in our survey?  Is there a requirement for timing, frequency, etc?

0

Decreasing Baseline Capacities for Unmet Load hours

NC-2009 EAp2:Minimum Energy Performance
posted by  F S  on 

Hi All,

My question is basically about how much can you decrease the baseline capacities without going to far - that might call Red flags.

1
Thu Oct 26, 2017, 7:12 pm

Minimum efficiencies for VRF with heat pump system

NC-v4 EAp2:Minimum energy performance
posted by  Instra Ingenieros  on 

Hi there, I have a question regarding VRF efficiencies. We have an office building that have VRF with heat pump systems that provide cooling and heating.

1
Thu Oct 26, 2017, 6:15 pm

Language of submission

Credit Forums
posted by  MAUDE PINTAL  on 

Hi,

We are in Quebec (Canada), and we are wondering if we can submit the LEED ND in Frensh ?

 

Thank you 

0

Innovation - Bird Collision Deterrence

NC-v4 INc1:Innovation
posted by  Geoffrey Katz  on 

For the Pilot Credit Bird Collision Deterrence one requirement is to "Develop a three-year post-construction monitoring plan to routinely monitor the effectiveness of the building and sit

1
Wed Feb 19, 2020, 6:49 pm
4
Sustainable Design Leader
Aurecon
LEEDuser Basic Member
7 thumbs up
Thu Oct 26, 2017, 1:09 pm
3
Thu Oct 26, 2017, 1:00 pm

Private Bathrooms

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Susan Coy  on 

Hi, I am currently working on a Recreation Facility exclusively used for the Female Lacrosse Team, for calculating the water reduction, can I calculate the Lavatory Faucet as Private, it is only u

4
Default Avatar
Environmentally Sustainable Design Assistant
Aurecon
LEEDuser Basic Member
2 thumbs up
Thu Oct 26, 2017, 11:49 am