Forum quick links
Option 1 - Combination of approaches allowed?
CI-2009 MRc5:Regional Materialsposted by R Jones on
Is it possible to use a combination of the 500 mile radius and the alternative compliance path addressing the mode of transport when documenting this credit ?
waste management by bedroom vs sf
Homes-v4 MRc3:Construction waste managementposted by Elizabeth Eason on
LEED v4 for homes Table 1:Baseline Waste list waste by both bedrooms and conditioned space but there is no guidance as to when one should use conditioned sf vs bedrooms.
Treated (rain) water for human contact...
NC-2009 WEc2:Innovative Wastewater Technologiesposted by Jorge Lopez de Obeso on
Here is a situation: Rain water is captured and treated for reusing to flush and flow fixtures. A single cistern storages both rainwater and municipal water supply.
72 Hour Universal Notification conflicts with weather patterns?
EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Managementposted by Heather DeGrella on
I'm working with a Community College that has numerous campuses in the Portland, Oregon area to submit IEQc3.6 as an ID credit for LEED NC.
Pilot Credit 34 Update
Pilot-Credits PC34:Design for Adaptabilityposted by Sandy Chung on
Be sure to use the Updated version 8/1/2011. The required features are in line with the California Building Code Accessibility requirements.
US Standard VS European standard used (EAp2)
posted by Ian McCall on
Dear Tristan, Here is another question with regards to LEED certification struggles in Europe, more specifically with regards to EA prerequisite 2 mandatory provisions (sections 5.4, 6.4, 7.4, 8.4,
Subtracting built-in furniture/casework from square footage
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by American University on
We've had a designer tell us that built-in furniture and case work (like a fan-coil unit enclosure) can be deducted from the square footage of a room when calculating the window opening requirement
Site Lighting for Campus Plan
CS-2009 EAp2:Minimum Energy Performanceposted by charles bell on
Hello, We have a campus application for our 3 mixed-use buildings. We are now on our final review and need to modify our submittal.
Help with table G3.1.1A,B
CS-2009 EAp2:Minimum Energy Performanceposted by charles bell on
The project consists of non residential building of 6 stories.
Recertification - Changed Cleaning Contractors
EBOM-2009 IEQc3.4:Green Cleaning—Sustainable Cleaning Equipmentposted by Greengrade User on
For a recertification, if the building management switches cleaning contractors partway through the performance period, and now completely different cleaning equipment is being used at the building