Forum quick links
Demand Control Ventilation
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Dylan Connelly on
I have a project with 14 small rooms (
Process energy? Exhaust Fan to relieve electric transformer heat
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Scott on
Our project has several spaces with electric transformers where we are using an exhaust fan and an outside air louver to relieve the heat loss from the transformer.
Regional Material Tracking with Multiple Forms of Transportation
NC-2009 MRc5:Regional Materialsposted by Karleigh Pihowich on
I have a material that was extracted 425 km from the manufacture point and transported by truck. After manufacture the material was shipped via rail to the project site which is 2076 km.
Demolition implemented by separate contractor
CS-2009 MRc2:Construction Waste Managementposted by Morteza Kasmaei on
This CS project is a major renovation to an existing building and has separate contractors for demolition and major construction.
Two methods: T-stats and windows in the same project?
CS-2009 IEQc6:Controllability of Systems—Thermal Comfortposted by Diana Nezamutinova on
Would a mechanically ventilated building be able to rely on 2 methods for documenting compliance: T-stats and windows? Some occupants will use one, while the others will rely on another.
Time Window for Rework
posted by Jean Marais on
GBCI documentation says that one has 25 working days to respond to "Clarifications".
LEED Online seems to get worse as time goes on (over past 4 yrs)
posted by Melissa Wrolstad on
Now LEED Online only works if I use a Chrome extension to Explorer - it does not work in regular Explorer anymore. Why is this the case?
SSc7.2 Weighted Average Calculator
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Gabriel Moreno on
Apologies if this question has already been answered - but I've searched as thoroughly as possible and did not find a satisfiable explanation. I am running a simple test with the following values;
LEED automation partners
posted by Michael Beattie on
Our very limited experience, and the comments here, indicated that LEED Online is time-wasting, cumbersome, and unresponsive. Nearly dysfunctional.
Kitchen Efficient Equipments
NC-2009 EAp2:Minimum Energy Performanceposted by Marina Andrade on
Hi! How can i gain points in my simulation with kitchen equipments? I'm working on a project that has automation and i don't know how can i indicate this. I think all kitchen equipments will be