Forum quick links
Change Certification level after Preliminary Design & Construction review
CS-v4 MPR1:Must be in a permanent location on existing landposted by Ronnel Flores on
Is it allowable that for Preliminary Design & Construction (D&C) submission, the project attempt for example, Silver rating.
External Lighting in car park with uncommon typology
NC-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Dear All,
Regarding the mandatory requirements of ASHRAE90.1 for external lighting power.
VOC Limit Table
Schools-NC-v4.1 EQc2:Low-Emitting Materialsposted by Katie Felver on
Where is it possible to find the current reference for the VOC limits by category?
Unisex Toilet
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by sebastian castañeda on
We are working on LEED NC 2009 for a new 9 stories building. There is one unisex toilet at each office level. How I determine the number of people will use those toilets?
LED strip
NC-v4 SSc6:Light pollution reductionposted by Ilse Dijkstra-Nugteren on
I have a question about SSc6 and the BUG rating method. We would like to use the BUG rating method for LED strips/lines which are fixed on the facade of the project.
ICC Now Accepting Applications to Serve on 2021/2022 Code Committees
posted by Kjell Anderson on
I'm guessing this is the most impactful thing any of us could do over the next couple of years. Energy Codes are far and away the biggest lever that our industry has in fighting climate change.
Option 2 - Reduction of Total Waste Material for major renovation project
NC-v4.1 MRc5:Construction and Demolition Waste Managementposted by Adam Yarnell on
Hi,
No envelope data
CI-v4 EAp2:Minimum energy performanceposted by Omar Elrawy on
I'm modeling a fit out space in which the data for the base building envelope (U values and SHGC) are not available, need to know if I can use the baseline envelope data in my proposed model?