Metering domestic hot water for kitchen - exemplary point in WEc
EBOM-2009 WEc1:Water Performance Measurementposted by Tom Kennedy on
Our project is a large office building with commercial kitchen (in house breakfast/lunch, etc).
LEED Review clarification
posted by Craig Wilson on
Quick question that I’m hoping you can help me with. When you submit credits and LEED comes back with a review, is that the first and only review?
Revisions to design submittal during CD submittal
posted by PATRICK HILLIER on
As part of my CD submittal response - that had corrections to my design submittal final - there were files that I was fairly certain I had uploaded but the response was "no new information was subm
Exactly at silver - can you add points after construction final?
posted by PATRICK HILLIER on
Based on my CD review comments and current estimates I am exactly 50 points for silver (2009 NC). If in our final review we miss any points we will not make silver.
ASHRAE forms for vrv systems
CI-2009 EAp2:Minimum Energy Performanceposted by Yaser Al Sharif on
Our System is VRV , and the hvac Ashrae forms - part 1 and 2 - does not comply with vrv system - how we could comply with them and many of them does not comply with vrv system ???????????
CO2 sensors in Residential Project
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Ilana Judah on
We have a large residential project that has natural ventilation being used. Are CO2 sensors required in every room/bedroom of the apartments?
Using a newer version of 90.1 than what LEED specifies
NC-2009 EAp2:Minimum Energy Performanceposted by Dave H on
I am working on a project that was registered under LEED NC 2.2. Will the USGBC allow us to apply requirements from 90.1 - 2010 to the project instead of 90.1 - 2004?
Owner Furnished Task Lighting
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Ryan L on
Under ASHRAE 90.1-2007 task lighting must have automatic shutoffs; the owner prefers not to install occupancy sensors/shutoffs at individual workstations.
option 2. views
EBOM-2009 IEQc2.4:Daylight and Viewsposted by Brian Dougherty on
I am trying to calculate the requirements and was wondering about some technical details. This is for a library on a college university. 1. Does the window sill have to be between 30-90"?