Post a question or comment
Filter by location
Forum
Topic
Replies
Recent
4
Thu Jul 11, 2013, 4:54 pm

Chillers COP consideration equivalent

NC-2009 EAp2:Minimum Energy Performance
posted by  Mohd Imran Shaikh  on 

Hi There, We are looking into a project which an office building and is going to be LEED certified.

5
Thu Jul 11, 2013, 2:47 pm

Residential Building - How to go ahead without using a survey?

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Prachee Mishra  on 

I am helping a residential development in New York City see if they can get LEED certification. The project is located in downtown Manhattan with close proximity to subway lines, ferry, bus lines.

3
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Thu Jul 11, 2013, 1:28 pm

Proposed v Baseline Outdoor air

NC-2009 EAp2:Minimum Energy Performance
posted by  Joseph Snider  on 

I am working on a multifamily building. The proposed system is a Rooftop unit with constant vlume and 100% outdoor air.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Jul 11, 2013, 8:22 am

Rubber Base

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Mariah Grife  on 

Does Rubber Base need to meet FloorScore certification, or is it exempt from this credit as it is not a "flooring" system itself?

3
Wed Jul 10, 2013, 9:12 pm

ACP forms

General forums
posted by  Jorge Lopez de Obeso  on 

Hi! I have been looking for the ACP forms but have not been able to find them.

5
Architect / Environmental adviser
eosis Consulting
LEEDuser Basic Member
20 thumbs up
Wed Jul 10, 2013, 6:56 pm

Unconditioned Spaces

NC-2009 EAp2:Minimum Energy Performance
posted by  Laura Long  on 

While modeling the building in the space-by-space method, there are a couple of closets that are not conditioned, therefore have been model as unconditioned in TRACE 700.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Jul 10, 2013, 6:46 pm

Spaces having plan views but not section views?

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Maya Karkour  on 

Dear All, I was wondering, how can a space comply with the plan view requirements (having sight lines to perimeter vision glazing), but not comply with the section view sight line? I thought if t

2
Wed Jul 10, 2013, 5:39 pm

Cold Galvanizing Compund, VOC complaince?

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Guillermo Hernandez Espinoza  on 

Hi everybody, I'm trying to categorize a cold galvanizing compound spray with the voc content expresed in percentage.

3
Wed Jul 10, 2013, 5:13 pm

GSF: from exterior or centerline of walls?

NC-2009 PIf2:Project Summary Details
posted by  Diana Nezamutinova  on 

CS stand-alone building: could the GSF measurements be taken from centerline of walls? Or should it be strictly taken from the exterior faces of exterior walls? Thank you!

3
Wed Jul 10, 2013, 4:19 pm