Forum » CI-2009 EAp2
Topic

Certified CS building

CI-2009 EAp2: Minimum Energy Performance
posted by gabriella Neves on May 8, 2012, 11:11 am

Dear all, I have a doubt regarding compliance with EAp2 in a CI certification.
It will be a CI certification of 8 floors in a recently LEED CS certified building.
As the building is...

Last reply: Marcus Sheffer, May 18, 2012, 9:49 am

EAp2- CRAC Units DO NOT Comply!?

CI-2009 EAp2: Minimum Energy Performance
posted by Graeme Smith on Nov 18, 2011, 3:02 am

Hi All,

My first post here... I really hope it works!

I'm LEED AP for the project working with a 3rd party engineer who has advised:
"Why the CRACs don't comply is because the...

Last reply: Marcus Sheffer, May 9, 2012, 12:38 pm

CI Project retail Store- EA PR2, ASHARAE 90.1, Section 9.4.1.2

CI-2009 EAp2: Minimum Energy Performance
posted by Sustentator Argentina on Apr 19, 2012, 12:33 pm

Hi, I have a question regarding the Space Controls.
The controls installed, control the spaces remotely and they are located inside the electric panel. The controls have a color indicator (...

Last reply: Bill Swanson, Apr 19, 2012, 2:35 pm

EAp2

CI-2009 EAp2: Minimum Energy Performance
posted by Monika Mickute on Apr 10, 2012, 3:56 pm

We recently purchased a 7,000 SF, 1-story office building for our own use. We are attempting LEED CI Platinum but are not touching the exterior walls or roof. They do not meet ASHRAE 90.1 2007...

Last reply: Linda Delair, Apr 18, 2012, 5:16 pm

EAc1.4

CI-2009 EAp2: Minimum Energy Performance
posted by Linda Delair on Apr 2, 2012, 5:35 pm

Are the requirements for Energy Star office equipment,electronics and appliances only for those which are newly purchased? if they were existing from before or brought over from the tenant's old...

Last reply: Erik Dyrr, Apr 17, 2012, 8:27 pm

Design Engineer

CI-2009 EAp2: Minimum Energy Performance
posted by Noriko Nagazumi on Mar 26, 2012, 3:40 am

Lighting system refurbishment, plumbing system refurbishment, rainwater ulilization system installation and purchasing some pieces of Energy Star rated equipment are included within our CI...

Last reply: Marcus Sheffer, Mar 28, 2012, 9:33 am

Using ASHRAE Addenda

CI-2009 EAp2: Minimum Energy Performance
posted by Luis Miguel Diazgranados on Feb 6, 2012, 3:00 pm

Hi everybody;

The reference guide states "Project teams wishing to use ASHRAE approved addenda for the purposes of this credit may do so at their discretion. Addenda must be applied...

Last reply: Luis Miguel Diazgranados, Mar 21, 2012, 12:52 pm

Energy simulation

CI-2009 EAp2: Minimum Energy Performance
posted by Pongthon Junnapat on Dec 2, 2011, 1:47 am

For LEED ID+C project, Do we have to include the entire building for energy simulation modeling? or just tenant scope of work

Thanks in advance

Last reply: Marcus Sheffer, Mar 20, 2012, 9:28 am

Building Envelope Compliance

CI-2009 EAp2: Minimum Energy Performance
posted by Omar Delgado on Nov 14, 2011, 10:14 am

Greetings,
We're doing a CI project where the glazing far surpasses the 40% wall area allowed on the north wall. However, the envelope will not be altered for this project. Does this mean...

Last reply: Marcus Sheffer, Mar 8, 2012, 1:33 pm

Energy Star Equipment and Timing

CI-2009 EAp2: Minimum Energy Performance
posted by Curt Pascoe on Feb 22, 2012, 5:36 pm

I'm bringing up a topic discussed but not solved in previous comments. What does the USGBC include in "equipment installed as part of the tenant's scope of work"? They list appliances, office...

Last reply: Emily Catacchio, Mar 7, 2012, 11:09 pm