Wood Framed Attic and Roof

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Paul Silverberg  on 

Our project was the complete renovation of a small building with masonry exterior walls, a concrete slab on grade at the first floor and wood framing for the interior walls, 2nd floor, attic and ro

1
Sat Aug 26, 2017, 10:06 pm

Elevator lobbies -with airlocks?

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Florian Schmidtchen  on 

Dear all, We have mechanically ventilated spaces. For the option 1 we therefore have to comply with the requirement B. interior cross-contamination prevention.

0

Fire Suppression water count as a candidate for Submetering?

CS-v4 WEc4:Water metering
posted by  Jennifer Turchin  on 

Can a fire suppression water line be one of the sub metered uses to meet the intent of this credit?

1
Fri Sep 1, 2017, 7:11 pm

Option 3 Strategy '4'

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Gail Napell  on 

For this strategy - if the take back / recycling system costs money (i.e. carpet recycling) does it still count as a strategy?

1
Sat Aug 26, 2017, 7:39 pm

Private shuttle buses

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Hanh Truong  on 

Dear all, I would like to use LI ID# 100001163 : "Shuttle buses should provide direct access to transit facilities within 2 miles of the project site, approximately a 5-10 minute drive, and must b

1
Thu Aug 10, 2017, 12:08 pm

CI clarification

CI-2009 MPR1:Must comply with environmental laws
posted by  Hariraman R  on 

If i want to Certify a portion of a building ?? shall i go for LEED CI ??

0

air-side economizer, how to input in calculator

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Courtney Royal  on 

Our project is a one floor (on the 30th) LEED-CI project gut renovation project.

1
Thu Aug 10, 2017, 10:42 am

List of meters

NC-v4 EAc3:Advanced energy metering
posted by  Vasileios Kalfountzos  on 

Hello all, our project is a Data Center that every single part of it will be metered. Each rack will have two meters while also every electrical panel will have each own meter.

1
Thu Aug 10, 2017, 4:04 pm

Double- Counting of Renewable Energy

CI-v4 EAc4:Renewable energy production
posted by  Bharath Ravuru  on 

Hi, We are going with solar panels on site at our facility. Can I use the renewable energy generated for both on-site renewable energy production credit and also energy savings in the simulation?

1
Mon Aug 28, 2017, 2:09 pm

Phased Flush Out

Schools-NC-v4 EQc4:Indoor air quality assessment
posted by  Cynthia Kaplan  on 

We have a phased reno/add school project that would prefer to earn IEQ 4 by way of post occupancy flush out.

1
Mon Aug 28, 2017, 2:09 pm