Calculator template

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by American University on Jan 23, 2012, 5:19 pm

Does anyone have an excel template that they created to calculate the baseline vs. installed case? I've been working on it, but it is complicated. Email: ...

Last reply: Michael Miller, Jan 26, 2012, 3:25 pm

Rainwater Harvesting

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by Udana Ratnayake on Dec 7, 2011, 11:51 pm

Is it possible to show compliance with this prerequisite by reducing potable water use by harvesting and reusing rainwater for flushing?

Last reply: Udana Ratnayake, Dec 20, 2011, 1:51 am

Authentication of water fixture installation date

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by David Mortensen on Sep 8, 2011, 1:32 pm

Had anyone successfully used as-built drawings to verify the installation date of water fixtures? On this page, the Checklist states that,

"Formal authentication of the fixture upgrade...

Last reply: Emily Catacchio, Dec 17, 2011, 7:56 pm

Baseline Vs Design Case

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by Simon Sue on Aug 17, 2010, 11:26 pm

will it be ok for submission if my faucet deisgn case gpm is double the baseline standard.
we have a situation here, whereby we unable to find a local aerator which could fix into the...

Last reply: Kimberly Ja, Oct 10, 2011, 5:45 pm

Transient Occupants (specifically students)

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by Ashley Chiang on Aug 8, 2011, 7:04 pm

I understand the different occupancy types and the default fixture use values; however, what I do not understand is how I am suppose to get a somewhat accurate estimation of a occupancy daily...

Last reply: Ashley Chiang, Sep 15, 2011, 12:02 pm

LEED EB- VERSION 2.0 WE prereq 1

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by Erika Duran on Jul 15, 2011, 2:17 pm

- HI everyone,
I am wondering if anyone could help me get the insight of the version 2.0 of this particular prerequisite. We actually need table 3 and 4 to run some calculations for filing...

Last reply: Jason Franken, Sep 13, 2011, 10:03 am

Good or no?

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by Elizabeth Crenshaw Hammitt on Jul 20, 2011, 4:54 pm

The way I am interpreting this credit, it would seem that is the project was built post 1994, while a baseline can be calculated, there is no chance of not meeting the PR as long as a...

Last reply: Dan Ackerstein, Aug 3, 2011, 11:07 am

Multiple Shift FTEs

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by Ed Okon on Dec 23, 2010, 8:44 am

I currently work for a manufacturing plant and am curious as to how I should approach the calculations for this credit. We operate on multiple shifts so, do I calculate the baseline and "...

Last reply: David Posada, Jul 8, 2011, 5:03 pm

FTE Calculations & Application

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by Austin Evans on Jun 16, 2011, 8:51 am

I'm having a hard time understanding what I should actually use here to put in the online forms for...

Last reply: Jenny Carney, Jun 22, 2011, 4:30 pm

Plumbing fixture 'renovation'?

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by Michael Miller on Jun 22, 2011, 1:26 pm

If pre-1993 plumbing fixtures are still in place (i.e. the bowls), but their flush valves have been replaced post-1993, does that count as 'plumbing renovation' / fixture replacement for the...

Last reply: Jenny Carney, Jun 22, 2011, 4:28 pm