Topic | Recent |
---|---|
Calculator templateEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by American University on Jan 23, 2012, 5:19 pm
Does anyone have an excel template that they created to calculate the baseline vs. installed case? I've been working on it, but it is complicated. Email: ... Last reply: Michael Miller, Jan 26, 2012, 3:25 pm |
|
Rainwater HarvestingEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Udana Ratnayake on Dec 7, 2011, 11:51 pm
Is it possible to show compliance with this prerequisite by reducing potable water use by harvesting and reusing rainwater for flushing? Last reply: Udana Ratnayake, Dec 20, 2011, 1:51 am |
|
Authentication of water fixture installation dateEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by David Mortensen on Sep 8, 2011, 1:32 pm
Had anyone successfully used as-built drawings to verify the installation date of water fixtures? On this page, the Checklist states that, "Formal authentication of the fixture upgrade... Last reply: Emily Catacchio, Dec 17, 2011, 7:56 pm |
|
Baseline Vs Design CaseEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Simon Sue on Aug 17, 2010, 11:26 pm
will it be ok for submission if my faucet deisgn case gpm is double the baseline standard. Last reply: Kimberly Ja, Oct 10, 2011, 5:45 pm |
|
Transient Occupants (specifically students)EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Ashley Chiang on Aug 8, 2011, 7:04 pm
I understand the different occupancy types and the default fixture use values; however, what I do not understand is how I am suppose to get a somewhat accurate estimation of a occupancy daily... Last reply: Ashley Chiang, Sep 15, 2011, 12:02 pm |
|
LEED EB- VERSION 2.0 WE prereq 1EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Erika Duran on Jul 15, 2011, 2:17 pm
- HI everyone, Last reply: Jason Franken, Sep 13, 2011, 10:03 am |
|
Good or no?EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Elizabeth Crenshaw Hammitt on Jul 20, 2011, 4:54 pm
The way I am interpreting this credit, it would seem that is the project was built post 1994, while a baseline can be calculated, there is no chance of not meeting the PR as long as a... Last reply: Dan Ackerstein, Aug 3, 2011, 11:07 am |
|
Multiple Shift FTEsEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Ed Okon on Dec 23, 2010, 8:44 am
I currently work for a manufacturing plant and am curious as to how I should approach the calculations for this credit. We operate on multiple shifts so, do I calculate the baseline and "... Last reply: David Posada, Jul 8, 2011, 5:03 pm |
|
FTE Calculations & ApplicationEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Austin Evans on Jun 16, 2011, 8:51 am
I'm having a hard time understanding what I should actually use here to put in the online forms for... Last reply: Jenny Carney, Jun 22, 2011, 4:30 pm |
|
Plumbing fixture 'renovation'?EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Michael Miller on Jun 22, 2011, 1:26 pm
If pre-1993 plumbing fixtures are still in place (i.e. the bowls), but their flush valves have been replaced post-1993, does that count as 'plumbing renovation' / fixture replacement for the... Last reply: Jenny Carney, Jun 22, 2011, 4:28 pm |