Topic | Recent |
---|---|
Variable Speed Fan Coil UnitNC-2009 EAc1: Optimize Energy Performanceposted by James Chueh on Nov 15, 2011, 2:22 am
There are more and more companies making fan coil units with... Last reply: Marcus Sheffer, Nov 16, 2011, 8:59 am |
|
Energy Modeling a Concrete DomeNC-2009 EAc1: Optimize Energy Performanceposted by Nelina Loiselle on Nov 8, 2011, 9:56 am
We are completing an energy model for a concrete dome. We chose the dome... Last reply: Marcus Sheffer, Nov 15, 2011, 10:02 am |
|
LEED 2009 Energy Modeling using HAP 4.3NC-2009 EAc1: Optimize Energy Performanceposted by Arub Vijay on Oct 26, 2011, 10:59 am
Is it acceptable to conduct the LEED 2009 Energy Modeling using Carrier HAP 4.3 version? I read that HAP 4.3 is based on ASHRAE 90.1-2004 whereas in LEED 2009 the reference standard is 90... Last reply: Marcus Sheffer, Oct 26, 2011, 5:46 pm |
|
CHP modelling Option 1 questionNC-2009 EAc1: Optimize Energy Performanceposted by Eszter Gulacsy on Jul 21, 2011, 11:12 am
I think I posted this question on the wrong page beforehand, so I'll post it again here. We are trying to account for a... Last reply: Christopher Schaffner, Oct 26, 2011, 2:06 pm |
|
Cooling tower's motorNC-2009 EAc1: Optimize Energy Performanceposted by James Chueh on Oct 14, 2011, 4:20 am
Cooling tower's performance is covered in 90.1 Table 6.8.1G, but does its motor have to comply with Table 10.8 Minimum Efficiency for Motors? Last reply: Marcus Sheffer, Oct 14, 2011, 5:46 pm |
|
Exceptional calculation- hot water use reduction in hotelNC-2009 EAc1: Optimize Energy Performanceposted by Christine Robbins-Elrod on Oct 10, 2011, 12:56 pm
We're working on a hotel that will have a reduction in hot water consumption throughout the hotel (particularly in the guestrooms, where 2.0 GPM showerheads and 1.0 GPM faucet aerators will be... Last reply: Marcus Sheffer, Oct 10, 2011, 3:20 pm |
|
heating load unmet hoursNC-2009 EAc1: Optimize Energy Performanceposted by Razan Nejem on Oct 3, 2011, 2:37 amunoccupied periods. At least that is our experience but we use eQUEST. Check out the HAP Users forum at http://onebuilding.org/ Log in or register to post comments ... Last reply: Marcus Sheffer, Oct 4, 2011, 8:05 am |
|
EAC1 Credit InformationNC-2009 EAc1: Optimize Energy Performanceposted by Sari Kujawa on Sep 21, 2011, 1:27 pm
Under the credit information website with "Credits, Credit Details, Points, Thresholds" listed. The Path is noted as "12% new/8% existing (1 pt) while our template form notes 10 points documented... Last reply: Sari Kujawa, Oct 3, 2011, 8:42 am |
|
Help needed: Process Energy / Water- 25% Default vs. ActualNC-2009 EAc1: Optimize Energy Performanceposted by Dan Prows on Feb 10, 2010, 4:09 pm
We have a child care center in the SE US. We did very well on envelope, lighting, and mechanical design (53% reduction in those areas). The building has a commercial kitchen with several... Last reply: Marcus Sheffer, Sep 23, 2011, 9:23 am |
|
Unusual Building ConstructionNC-2009 EAc1: Optimize Energy Performanceposted by Tom Nichols on Jun 28, 2011, 6:44 am
We are working on an eQuest model of a very unusual building. It was constructed in 1911. The original building had a lower level, first and second floor in the main wing and four stories of... Last reply: Marcus Sheffer, Sep 19, 2011, 4:56 pm |